Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Dickerson Florida Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />This project consists of the roadway widening and placement of asphalt <br />millings to the following streets in Vero Lake Estates located in Indian River County, <br />Florida: 85th Street (96th Avenue to 91st Avenue), 99th Court (77th Street to 79th Street), <br />100th Avenue (77th Street to 79th Street), 100th Court (77th Street to 79th Street), 101st <br />Avenue (77th Street to 79th Street) 102nd Avenue (77th Street to 83rd Street). This project <br />will include drainage improvements, regrading of swales, clearing and grubbing, and <br />replacement of grassed area within the project limits. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Vero Lake Estates Asphalt Millings Project (Phase II) <br />County Project Number: 1317 <br />Bid Number: 2015039 <br />Project Address: 85th Street, 99th Court, 100th Avenue, 100th Court, 101st Avenue, <br />102nd Avenue, Vero Beach, Florida <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />F:\Purchasing\Bids\2014-2015 FY (2015000)\2015039 - VLE Petition Millings - Phase II\00520 - Agreement (Public Works) REV 06-14.doc <br />