My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.07 Patent Fees and Royalties 22 <br />6.08 Permits 22 <br />6.09 Laws and Regulations 22 <br />6.10 Taxes 22 <br />6.11 Use of Site and Other Areas 22 <br />6.12 Record Documents 23 <br />6.13 Safety and Protection 23 <br />6.14 Safety Representative 24 <br />6.15 Hazard Communication Programs 24 <br />6.16 Emergencies 24 <br />6.17 Shop Drawings and Samples 24 <br />6.18 Continuing the Work 25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 26 <br />ARTICLE 7 - OTHER WORK 26 <br />7.01 Related Work at Site 26 <br />7.02 Coordination 27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 27 <br />8.01 Communications to Contractor 27 <br />8.02 Replacement of ENGINEER 27 <br />8.03 Furnish Data 27 <br />8.04 Pay Promptly When Due 27 <br />8.05 Lands and Easements; Reports and Tests 27 <br />8.06 Insurance 28 <br />8.07 Change Orders 28 <br />8.08 Inspections, Tests, and Approvals 28 <br />8.09 Limitations on OWNER's Responsibilities 28 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8.11 Evidence of Financial Arrangements 28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 28 <br />9.01 OWNER'S Representative 28 <br />9.02 Visits to Site 28 <br />9.03 Project Representative 28 <br />9.04 Clarifications and Interpretations 29 <br />9.05 Authorized Variations in Work 29 <br />9.06 Rejecting Defective Work 29 <br />9.07 Shop Drawings, Change Orders and Payments 29 <br />9.08 Determination for Unit Price Work 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 30 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 30 <br />10.01 Authorized Changes in the Work 30 <br />10.02 Unauthorized Changes in the Work 30 <br />10.03 Execution of Change Orders 30 <br />10.04 Notification to Surety 31 <br />10.05 Claims and Disputes 31 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 3 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \I317 -85th St Milling_91st Ave to 101st Ave \Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.