Laserfiche WebLink
concept of the completed Project as a functioning <br />whole as shown or indicated in the Contract <br />Documents (unless there is a specific statement <br />indicating otherwise). The use of any such term or <br />adjective shall not be effective to assign to ENGI- <br />NEER any duty or authority to supervise or direc <br />the performance of the Work or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 0.10 or any other provision <br />of the Contract Documents. <br />B. Day <br />1. The word "day" shall constitute a <br />calendar day of 24 hours measured from <br />midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when modifying <br />the word "Work," refers to Work that is <br />unsatisfactory, faulty, or deficient in that it does <br />not conform to the ContracDocuments or does <br />not meet the requirements of any inopection, <br />reference standard, test, or approval referred to <br />in the Contract Oocumentm, or has been <br />damaged prior to ENGINEER's recom- <br />mendation of final payment (unless responsi- <br />bility for the protection thereof has been <br />assumed by OWNER at Substantial <br />Completion in accordance with paragraph <br />14.04 or 14.05). <br />O. Fumish, Install, Perform, Provide <br />1. The word "fumish," when used in <br />2. The word "install," when used in <br />connection with :en/icaa, materials, or <br />use. <br />3. The words "perform" or "provide," <br />when used in connection with services, <br />and install said se <br />s, materials, or <br />4. When "furnish," "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context dearly <br />requiring an obligation of CONTRACTOR, <br />"provide" is implied. <br />E. Un!ess stated otherwise in the Contract Docu <br />nlenta, words or phrases which have a well-known <br />technical or construction iridustry or trade meaning are <br />used in the Contract Documents in accordance with <br />such recognized meaning. <br />ARTICLE 2- PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also <br />deliver to OWNER such Bonds as CONTRACTOR <br />may be required to fumish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish to CONTRACTOR up <br />to ten copies of the Contract Documents. Additional <br />copies will be fumished upon request at the cost of <br />reproduction. <br />2.03 Commencement of Contract TimesNotice <br />to Proceed <br />A. The Contract Times will commence to run on <br />the thirtieth day after the Effective Date of the Agree- <br />ment or, if a Notice to Proceed is given, on the day <br />indicated in the Notice to Proceed. A Notice to Pro- <br />ceed may be given at any time within 30 days after the <br />Effective Date of the Agreement. In no event will the <br />Contract Times commence to run later than the <br />ninetieth day after the day of Bid opening or the <br />thirtieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2,04 Starting the Work <br />A. CONTRACTOR shall start to perform the <br />Work on the date when the Contract Times com- <br />mence to run. No Work shall be done at the Site prior <br />to the date on which the Contract Times commence to <br />run. <br />2.05 Before Starting Construction <br />A. CONTRACTOR's Review of Contract Docu- <br />ments: Before undertaking each part of the VVork. <br />CONTRACTOR shafl carefuHy study and compare the <br />00700 - General Conditions REV 5-10-13 <br />00700 - 8 <br />p:1PublicworksENGINEERING DIVISION PROJECTS11o`7-55thmMilling_9`*Ave m`o,*Ave‘Admmkbid documentsWaster Contract Documents100700 General Conditions REV 5- <br />