My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. differs materially from that shown or <br />indicated in the Contract Documents; or <br />4. is of an unusual nature, and differs <br />materially from conditions ordinarily <br />encountered and generaily recognized as inher- <br />ent in work of the character provided for in the <br />Contract Documents; <br />then CONTRACTOR shall, promptly after becoming <br />aware thereof and before further disturbing the <br />subsurface or physical conditions or performing any <br />Work in connection therewith (except in an emergency <br />as required by paragraph 6.16.A), notify OWNER and <br />ENGINEER in writing about such condition. <br />CONTRACTOR shall not further disturb such <br />condition or perform any Work in connection therewith <br />(except as aforesaid) until receipt of written order to do <br />so. <br />B. ENGINEER's Review: After receipof written <br />noti� as required by paragraph 4.03.A, ENGINEER <br />will promptly review the pertinent condition, determine <br />the necessity of OWNER's obtaining additional <br />exploration or tests with respect thonabz, and advise <br />OWNER in writing (with a copy to CONTRACTOR) of <br />ENG|NEER'ufindings and conclusions. <br />C. Possib/e Price and Times Adjustments <br />1. The Contract Price or the Contract <br />Times, or both, will be equitably adjusted to the <br />extent that the existence of such differing <br />subsurface or physical conditiori causes an in- <br />crease or decrease in C[)NTFACTOR'o cost <br />of, or time required for, performance of the <br />Work; subject, however, to the following: <br />a. such condition must meet any one or <br />more of the categories described in para- <br />graph 4.03.A; and <br />b. with respect to Work that is paid for <br />on a Unit Price Baois, any adjustment in <br />Contract Price will be subject to the <br />provisions of paragraphs 9.08 and 11.03. <br />2. CONTRACTOR shafl not be entitled <br />to any adjustment in the Contract Price or <br />Contract Times if: <br />a. CONTRACTOR knew of the <br />existence of such conditions at the time <br />CONTRACTOR made a final commitment <br />to OWNER in respect of Contract Price and <br />Contract Times by_ the submission of a Bid <br />or becoming bound under a negotiated <br />contract; or <br />b. the existence of such conitiomcould <br />reasonably have been discovered or <br />revealed as a result of any examination, <br />invaoU0aUon, ewp|onabon, test, or study of <br />the Site and contiguous areas required by <br />the Bidding Requirements or Contract <br />Documents to be conducted by or for CON- <br />TRACTOR prior to CONTRACTOR's <br />making such final commitment: or <br />c. CONTRACTOR failed to give the <br />written notice within the time and as re- <br />quired <br />3. If OWNER and CONTRACTOR are <br />unable to agree on entitlement to or on the <br />amount or extent, if any, of any adjustment in <br />the Contract Price or Contract Times, or both, a <br />Claim may be made therefor as provided in <br />paragraph 10.05. However, OWNER, <br />ENGINEER, and ENGINEER's Consultants <br />shall not be liable to CONTRACTOR for any <br />claims, costs, |oasem, or damages (including <br />but not limited to all fees and charges of <br />engineern, archUtects, ottonnoye, and other <br />professionats and alt court or arbitration or other <br />dispute resolution costs) sustained by <br />CONTRACTOR on or in connection with any <br />other project or anticipated project. <br />4.04 Underground Facilities <br />A. Shown or !ndicated: The nformation and data <br />shown or indicated in the Contract Documents with <br />respect to existing Underground Facilities at or <br />contiguous to the Site is based on information and <br />data furnished to OWNER or ENGINEER by the <br />owners of such Underground Facilities, including <br />[)VVNER, or by others. Unless it is otherwise <br />expressly provided in the Supplementary Conditions: <br />1. OWNER and ENGINEER shall not <br />be responsible for the accuracy or com- <br />pleteness of any such information or data; and <br />2. the cost ot alt of the following will be <br />included in the Contract Price, and CONTRAC- <br />TOR shall have full responsibility for: <br />a. reviewing and checking all such <br />information and data, <br />00700 - General Conditions REV 5-10-13 <br />00700 - 12 <br />pAP"mic,m*"tEwoINssnwaowmmwpwmsorm,mr-8ommMiwng_,*Ave mm,*^vew*mi"kbiuu="=ent*m"*erContract o="mem*00r00 General Conditions REV 5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.