identified in the SuryConditionstobe|ish*d
<br />as insureds or additional insureds (and the officers,
<br />dir»cbors, pahomrs, mmnp|oyees, ogenb;, and other
<br />consultants and subcontractors of each and any of
<br />them) for all losses and damages caused by, arising
<br />out of, relating to, or resulting from any of the perils or
<br />causes of Ioss covered by such policies and any other
<br />property insurance applicable to the Work. If the
<br />insurers on any such policies require separate waiver
<br />forms to be signed by any Subcontractor or Supplier,
<br />CONTRACTOR will obtain the same.
<br />6.07 Patent Fees and Royalties
<br />A. CONTRACTOR shapay all Iicense fees and
<br />royalties and assume all costs incident to the use in
<br />the performance of the Work or the incorporation in
<br />the Work of any inwynUon, dasi0n, pnooeso, produot,
<br />or device which is the subject of patent rights or
<br />copyrights held by others. If a particular invent|on,
<br />doaign, pnooeoo, pnoduot, or device is specified in the
<br />Contract Documents for use in the performance of the
<br />Work and if to the actual knowledge of OWNER or
<br />ENGINEER its use is subject to patent rights or
<br />copyrights catling for the payment of any license fee or
<br />royalty to othmno, the existence of such rights shall be
<br />disclosed by OWNER in the Contract Documents. To
<br />the fullest extent permitted by Laws and Ragu|adono.
<br />CONTRACTOR shall indemnify and hold harmless
<br />OWNER, ENGINEER, ENGINEER's Consultants, and
<br />the officers, dineobore, portnora, employees or agents,
<br />and other consultants of each and any of them from
<br />and against all claims, costs, |oawmo, and damages
<br />(including but not limited to all fees and charges of
<br />enginmans, anohheots, oMorneya, and other
<br />professionals and all court or arbitration or other
<br />dispute resolution costs) arising out of or relating to
<br />any infringement of patent rights or copyrights incident
<br />to the use in the performance of the Work or resulting
<br />from the incorporation in the Work of any invention,
<br />design, process, product, or device not specified in the
<br />Contract Documents.
<br />6.08 Permits
<br />A. Unless otherwisin the Supple-
<br />mentary Conditions, CONTRACTOR shall obtain
<br />upple-mentaryConditiona.CONTRACTORshaUnbtahn and
<br />pay for alt construction permits and licenses. OWNER
<br />shall assist CONTRACT[)R, when necomsory, in
<br />obtaining such permits and licenses. CONTRACTOR
<br />shall pay all governmental charges and inspection
<br />fees necessary for the prosecution of the Work which
<br />are applicable at the time of opening of Bids, or, if
<br />there are no Bids, on the Effective Date of the
<br />Agreement. CONTRACTOR shall pay all charges of
<br />utility owners for connections to the Work, and
<br />OWNER shall pay all charges of such utility owners
<br />for capital costs related thereto, such as plant
<br />investment fees.
<br />6.09 Laws and Regulations
<br />A. CONTRACTOR shall give all notices and
<br />comply with alt Laws and Regutations appticable to the
<br />performance of the Work. Except where otherwise
<br />expressly required by applicable Laws and
<br />Regulations, neither OWNER nor ENGINEER shall be
<br />responsible for monitoring CONTRACTOR's compli-
<br />ance with any Laws or Regulations.
<br />omp/i'ancewithanyLavmsorRogu/adonn.
<br />B. If CONTRACTOR performs any Work know-
<br />ing or having reason to know that it is contrary to Laws
<br />or Rmgu|abono. CONTRACTOR shall bear all claims,
<br />costs, |ooaeo, and damages (including but not limited
<br />to all fees and charges of engineens, architecb;,
<br />a#onnmyo, and other professionals and all court or
<br />arbitration or other dispute resolution costs) ansing out
<br />of or relating to such Work; hcwvavmr, it shall not be
<br />CONTRACTOR's primary responsibility to make
<br />certain that the Specifications and Drawings are in
<br />accordance with Laws and Ragu/odono, but this shall
<br />not relieve CONTRACTOR of CONTRACTOR's
<br />obligations under paragraph 3.03.
<br />C. Changes in Laws or Regulations not knowat
<br />the time of opening of Bids (or, on the Effective Date
<br />of the Agreement if there were no Bids) having an
<br />effect on the cost or time of performance of the Work
<br />may be the subject of an adjustment in Contract Price
<br />or Contract Times. If OWNER and CONTRACTOR
<br />are unable to agree on entitlement to or on the
<br />amount or extent, if any, of any such adjustment, a
<br />Claim may be made therefor as provided in paragraph
<br />10.05.
<br />6.10
<br />Taxes
<br />A. CONTRACTOR shall pay all sales, consum-
<br />er, use, and other similar taxes required to be
<br />paid by CONTRACTOR in accordance with
<br />the Laws and Regulations of the place of the
<br />Project which are applicable during the
<br />performance of the Work.
<br />B. OWNER qualifies for state and local sales tax
<br />exemption in the purchase of all material and
<br />equipment.
<br />6.11 Use of Site and OtherAreas
<br />A. Limitation on Use of Site and Other Area
<br />1. CONTRACTOR shall confine
<br />construction eguipment, the storage of
<br />00700 - General Conditions REV 5-10-13
<br />00700-22
<br />F:PubIic WorksENGINEERING DIVISION PROJECTS\1 31 7 -85th SI MiIIingOl st Ave 10 101 sI AvelAdmin\bid docurnontsMaster C"mra*o°=men*xm,00 General Conditions REV 5-