My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-145
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:34:08 PM
Creation date
8/10/2015 2:41:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/14/2015
Control Number
2015-145
Agenda Item Number
8.N.
Entity Name
Mack Concrete Industries
Subject
Wastewater Treatment Plant
Area
Blue Cypress
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 - EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />7 iy-�s <br />8.N <br />2015- Os <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the 14 day of July in the <br />year 2015 by and between Indian River County, a political subdivision of the State of Florida <br />(hereinafter called OWNER) and Mack Concrete Industries, Inc. (hereinafter called <br />CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br />all of the necessary labor, material, and equipment to perform the work as specified or indicated <br />in the Contract Documents. The work is generally described as follows: <br />A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br />Documents. The work is generally described as follows which shall include, but is not <br />necessarily limited to the following. <br />Indian River County (IRC) proposes to abandon the existing steel package wastewater <br />treatment plant and replace it with a new 17,000 gallon per day (GPD) package <br />wastewater treatment plant. The replacement plant will be constructed and placed into <br />operation before the existing plant is abandoned. <br />The project consists of, but is not limited to: abandon the existing steel package plant <br />and replace the plant with a new 17,000 GPD package concrete tertiary wastewater <br />treatment plant which will include surge tank, duplex aeration tanks, dual final clarifier <br />tanks, aerated digester tank, dual cell tertiary filters, and duplex chlorine tanks; and <br />modification of the effluent disposal system; provide all necessary electrical equipment <br />and devices as shown on the electrical plans; provide all concrete slabs and site work <br />shown on the plans; and all other items as required for an operational project. <br />B. The OWNER shall have the option of direct purchase of all material and equipment for the <br />project in accordance with Rule 12A-1.094 of the Florida Administrative Code. The <br />contractor will be responsible for preparing the purchase documents for purchasing by the <br />owner. The contractor will be responsible for scheduling, receiving, handling, and storage <br />of all direct purchase material and equipment. <br />ARTICLE 2 ENGINEER <br />The project has been designed by Masteller & Moler, Inc., hereinafter called ENGINEER, and who <br />is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br />and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br />the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 Bidder agrees that the work as generally described herein, will be completed in <br />accordance with the following timeframe. <br />00530-1 ATTACHMENT NO.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.