Laserfiche WebLink
that: 1) the County as OWNER shall receive immediate written notice of all decisions <br />made by CONTRACTOR to withhold retainage on any subcontractor at greater than five <br />percent (5%) after fifty percent (50%) completion; and 2) CONTRACTOR will not seek <br />release from the County as OWNER of the withheld retainage until the final pay request. <br />5.3 Paragraphs 5.1 and 5.2 do not apply to construction services work purchased by the <br />County as OWNER which are paid for, in whole or in part, with federal funds and are <br />subject to federal grantor laws and regulations or requirements that are contrary to any <br />provision of the Local Government Prompt Payment Act. In such event, payment and <br />retainage provisions shall be governed by the applicable grant requirements and <br />guidelines. <br />5.4 ACCEPTANCE AND FINAL PAYMENT: Upon receipt of written notice that the work is <br />ready for final inspection and acceptance, the ENGINEER will promptly make such <br />inspection and when the ENGINEER finds the work acceptable under the terms of the <br />Contract and the Contract fully performed, the ENGINEER will promptly issue a final <br />completion certificate stating that the work provided for in this Contract has been <br />completed, and acceptance by the OWNER under the terms and the conditions thereof is <br />recommended and the entire balance found to be due the CONTRACTOR, will be paid to <br />the CONTRACTOR by the OWNER following County Commission approval of the final <br />Contract payment. <br />5.5 Acceptance of Final Payment as Release. The acceptance by the CONTRACTOR of final <br />payment shall be and shall operate as a release to the OWNER from all claims and all <br />liability to the CONTRACTOR other than claims in stated amounts as may be specifically <br />excepted by the CONTRACTOR for all things done or furnished in connection with the <br />work under this Contract and for every act and neglect of the OWNER and others relating <br />to or arising out of the work. Any payment, however, final or otherwise, shall not release <br />the CONTRACTOR or its sureties from any obligations under the Contract Documents or <br />the Payment and Performance Bonds. <br />ARTICLE 6 INTEREST <br />Not Applicable. <br />ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br />Documents, work, site, locality, and all local conditions and laws and regulations that in <br />any manner may affect cost, progress, performance or furnishing of the work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br />determination set forth in Paragraph SC -4.02 of the Supplementary Conditions of the <br />extent of the technical data contained in such reports and drawings upon which <br />CONTRACTOR is entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (in addition to or to supplement those referred to in Paragraph 7.2 <br />00530-4 ATTACHMENT NO.1 <br />