My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/12/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
05/12/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 2:16:48 PM
Creation date
8/12/2015 11:48:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/12/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT <br /> INDIAN RIVER COUNTY, FLORIDA 7 I, <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director Cv-"-" <br /> FROM: Christopher J. Kafer,Jr., P.E., County Engineer <br /> SUBJECT: Change Order No. 1 and Release of Retainage <br /> 69th Street Bridge over the Indian River Farms Water Control District <br /> (IRFWCD) Lateral G Canal IRC Project No. 1363 <br /> DATE: April 28, 2015 <br /> DESCRIPTION AND CONDITIONS <br /> On October 14,2014,the Board of County Commissioners awarded Bid No.2014045 in the amount of <br /> $224,228.88 to Melvin Bush Construction, Inc. for improvements that included the removal of the <br /> existing 2-lane bridge on 69th Street over the IRFWCD Lateral G Canal and replacement of the existing <br /> bridge with a 96"reinforced concrete pipe(RCP)culvert. Also included with the project is installation <br /> of a 60" RCP culvert in the IRFWCD Sub-lateral G-4 canal. <br /> The project has been completed and Change Order No. 1 is to make final adjustments to bid line <br /> items to decrease the total contract by $33,658.44 for a final contract price of$190,570.44. <br /> Melvin Bush Construction, Inc. has been paid $181,041.92 to date,with$9,528.52 held in retainage. <br /> Melvin Bush Construction, Inc.has submitted Contractor's Pay Application No.3 Final in the amount <br /> of$9,528.52 for release of retainage. <br /> FUNDING <br /> Funding for Melvin Bush Construction, Inc. Pay Application No.3 Final is budgeted and available from <br /> the following Optional Sales Tax Retainage,Account No.315-206000-14011,69th Street Bridge in the <br /> amount of$9,528.52. <br /> RECOMMENDATION <br /> Staff recommends approval of Change Order No. 1 to Melvin Bush Construction, Inc.,decreasing the <br /> contract to$190,570.44 and of Melvin Bush Construction, Inc.Contractor's Application for Payment <br /> No. 3 in the amount of$9,528.52 for release of retainage. <br /> 161 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS1363-69th St Bridge(4 Lal 0 Canal-Culvert Install\Admin'agenda itenis\BCC Agenda CO I and <br /> Release Retainage.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.