INDIAN RIVER COUNTY, FLORIDA CONSENT <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director ( -" <br /> Christopher J. Kafer,Jr., P.E., County Engine- AP/ <br /> FROM: Richard B. Szpyrka, P.E., Project Engineer 4;;„ <br /> SUBJECT: Amendment #7 to the Civil Engineering and Land Surveying Agreement for <br /> Intersection Improvements at SR-60 and 43rd Avenue and the Widening of 43rd <br /> Avenue from 18th Street to 26th Street with Arcadis US, Inc. <br /> IRC Project No. 0853 <br /> DATE: April 23, 2015 <br /> DESCRIPTION AND CONDITIONS <br /> Arcadis US, Inc. (fka Arcadis, G&M) is under contact with Indian River County to provide Civil Engineering <br /> and Land Surveying Services for improvements to the SR-60/43rd Avenue Intersection and the widening of <br /> 43rd Avenue from 18th Street to 26th Street. Attached Amendment No. 7 includes the following: <br /> • The project was designed at the same time as the widening of 43rd Avenue from 18th Street south to <br /> 8th Street, designed by Carter Associates, Inc. Both designs assumed that construction would <br /> happen concurrently,and therefore design of a transition from the new four lane configuration to <br /> the existing two lane configuration was not included in either plan. It has been determined that the <br /> roadway widening south of 18th street (the Carter Associates, Inc. design)will not be constructed <br /> until later and plan revisions are needed to provide for a transition from the new four lane section <br /> to the existing two lane section. The roadway/drainage plans and profile sheets will be revised to <br /> show required improvements. <br /> • In addition,the two projects designed by Arcadis US, Inc.&Carter Associates, Inc.were coordinated <br /> to incorporate a portion of the stormwater treatment for the Arcadis US, Inc. roadway into the <br /> Carter Associates, Inc.design for stormwater treatment. It has been determined that the roadway <br /> widening and drainage system south of 18th street (the Carter Associates, Inc. design)will not be <br /> constructed until later.Therefore, revisions to the Arcadis US, Inc.design are necessary to provide <br /> for a drainage system to accommodate the portion of the Arcadis US,Inc.project that was originally <br /> directed south into the Carter Associates, Inc. project.The design will consist of inlets and pipes to <br /> convey runoff from 43rd Avenue to a new stormwater drainage pond. Hydraulic calculation will be <br /> performed to size the pipe system and the stormwater drainage pond.The roadway/drainage plans <br /> and profile sheets will be revised to show required improvements. <br /> • The project design will be updated to FDOT 2015 design standards. <br /> The total negotiated lump sum for Amendment No.7 is$93,691.61.This amount added to the current contract <br /> amount of$1,008,786.05 results in a new contract amount of$1,102,477.66. <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0853-43rd AVE 18th ST to 26th ST(Arcadis)\Admim\agenda items\Arcadis Proposal 115 <br /> 042215\0853 BCC Agenda Memo for Arcadis Amendment#7-0423I5.doc <br />