My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES,INC. <br /> 43RD AVENUE BRIDGE OVER MAIN RELIEF CANAL <br /> March 13,2015 <br /> BDA PROJECT NO.:05-809B <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT"A" <br /> CHIEF PROJECT PROJECT ENGINEER FIELD TOTAL LABOR <br /> ENGINEER IMAGER ENOiHEER INTERN REP TECHNICIAN HOURS COST <br /> ACTMTY <br /> '� ,e..�..�. .. .. _ BY BY <br /> ACTIVITY ACTIVITY <br /> $195.00 $105.00 $82.00 $80.00 573.00 09100 <br /> Update Notes and Design Standards 4.0 8.0 4.0 18 0 51,848 00 <br /> AASHTO Girder Analysis 4.0 18.0 8.0 28 0 $2,958 03 <br /> Bridge Load Rating 4.0 40,0 44 0 14,420 00 <br /> 0.0 10 00 <br /> 0.0 5000 <br /> . <br /> TOTAL NANHOURS 0.0 12,0 + 84.0 0.0 0.0 12.0 I 88.0 <br /> DIRECT LABOR CART $0.00 $,220.00 15 <br /> ,88810 $0.00 $0.00 51.116.00 I $9,224.00 <br /> ENGINEERING FEES $5,22400 <br /> S'2035JobE0-8098 43rd Avenue et Main Reber CanaA2015101 AdmintProposaals\propose103-13-15AI <br /> 132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.