Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES,INC. <br /> 43RD AVENUE BRIDGE OVER MAIN RELIEF CANAL <br /> March 13,2015 <br /> BDA PROJECT NO.:05-809B <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT"A" <br /> CHIEF PROJECT PROJECT ENGINEER FIELD TOTAL LABOR <br /> ENGINEER IMAGER ENOiHEER INTERN REP TECHNICIAN HOURS COST <br /> ACTMTY <br /> '� ,e..�..�. .. .. _ BY BY <br /> ACTIVITY ACTIVITY <br /> $195.00 $105.00 $82.00 $80.00 573.00 09100 <br /> Update Notes and Design Standards 4.0 8.0 4.0 18 0 51,848 00 <br /> AASHTO Girder Analysis 4.0 18.0 8.0 28 0 $2,958 03 <br /> Bridge Load Rating 4.0 40,0 44 0 14,420 00 <br /> 0.0 10 00 <br /> 0.0 5000 <br /> . <br /> TOTAL NANHOURS 0.0 12,0 + 84.0 0.0 0.0 12.0 I 88.0 <br /> DIRECT LABOR CART $0.00 $,220.00 15 <br /> ,88810 $0.00 $0.00 51.116.00 I $9,224.00 <br /> ENGINEERING FEES $5,22400 <br /> S'2035JobE0-8098 43rd Avenue et Main Reber CanaA2015101 AdmintProposaals\propose103-13-15AI <br /> 132 <br />