My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I \ i <br /> . : ; , <br /> fence at the County's expense along the east side of the Kurpil's property on the <br /> Kurpil's property. <br /> 4. When installing the fence, if deemed necessary by the installer of the fence, the County <br /> will scrape the fence line so it is level and thereby removing an approximate 40 foot <br /> long raised section of dirt at approximately the middle of the Kurpil's eastern property <br /> line. This dirt will be placed on the north side of the pond at a point to be established <br /> by the Kurpils with a stake to mark the point. The scraped area will be resodded by <br /> the County. The Kurpils shall be responsible to grade the dirt. If the fence installer <br /> deems it unnecessary to scrape the 40 feet of fence line, the County will place two <br /> dump truck loads of fill on the north side of the pond where indicated by the stake. <br /> 5. The County or its contractor will grade and sod a swale along the north property line <br /> of the Kurpil property the location of the swale is depicted on exhibit"B" attached. The <br /> swale will be constructed so that water will drain from east to west to the swale located <br /> along the western edge of the Kurpil property. The existing swale on the north western <br /> portion of the Kurpil property will be filled in and sodded by the County or its contractor. <br /> 6. In the event that the drainage pipe along 67th Avenue (west side of the Kurpil property) <br /> is too small and/or the existing drainage swale along the west side of the Kurpil <br /> property needs to be re-graded, the pipe shall be upsized and/or the swale regraded. <br /> These tasks shall be performed by the County or its contractor at the County's <br /> expense. <br /> 7. At the time the swale along the north side of the Kurpil property is constructed. The <br /> County or its contractor will install an outfall pipe from the Kurpil pond to the swale. <br /> This work shall be done at the County's expense. <br /> 8. The County or its contractor will move dirt from the southeast area of the pond and <br /> restore the bank and cover the bare soil with sod. <br /> 2 <br /> 208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.