My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Provide a review with the Owner and Design/Builder to discuss the functional and <br /> organizational relationships,project scope,functional requirements,first estimate <br /> of construction and project cost and to confirm the objectives for the project are <br /> being met. <br /> 6. Provide Construction Documents at 60%and 90% for review and approval by the <br /> Owner and construction pricing by Barth Construction. Construction Documents <br /> shall include drawings,specifications,and other documents and electronic data <br /> setting forth in detail the requirements for construction of the work. These <br /> documents will include normal structural,mechanical, and electrical engineering <br /> services. All Civil engineering Services for Design and Permitting of the Fire <br /> Sprinkler main line and backflow preventcr systems will be by others. <br /> 7. Provide 100%Construction documents for construction permitting and book form <br /> specifications. Construction documents will comply with the requirements of <br /> Article 3.2.3 of the Part 2 Agreement between Indian River County and Barth <br /> Construction acting as Design/Builder. <br /> B. Purpose <br /> Construction Administration Services which will be considered Part 2 of our services. <br /> C. Compensation to the Architect <br /> Compensation for the Part 1 Services defined in Article"A"shall be a fixed fee of <br /> $84,645.00,including Reimbursable Expenses. <br /> D. Invoicing <br /> Invoicing shall be every two weeks. The Architect realizes his compensation is <br /> contingent upon Barth Construction being in receipt of payment from hudian River <br /> County in accordance with the Master Agreement and the Florida Prompt Payment Act, <br /> F.S.218.70,however,EDB Architects requests that the agreement between Barth <br /> Construction and IRC be front loaded to allow compensation for the Design Team work <br /> performed in Part 1. <br /> PROGRAMMING/SCOPE DATA $2,500.00 <br /> SCHEMATIC DESIGN PHASE $19,328.00 <br /> DESIGN DEVELOPMENT PHASE $24,160.00 <br /> WORKING DRAWINGS PHASE $38,657.00 <br /> REIMBURSABLE EXPENSES Included <br /> PART 1 TOTAL FEES S84,645.00 <br /> Page 2 of 3 <br /> 227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.