Laserfiche WebLink
5. Provide a review with the Owner and Design/Builder to discuss the functional and <br /> organizational relationships,project scope,functional requirements,first estimate <br /> of construction and project cost and to confirm the objectives for the project are <br /> being met. <br /> 6. Provide Construction Documents at 60%and 90% for review and approval by the <br /> Owner and construction pricing by Barth Construction. Construction Documents <br /> shall include drawings,specifications,and other documents and electronic data <br /> setting forth in detail the requirements for construction of the work. These <br /> documents will include normal structural,mechanical, and electrical engineering <br /> services. All Civil engineering Services for Design and Permitting of the Fire <br /> Sprinkler main line and backflow preventcr systems will be by others. <br /> 7. Provide 100%Construction documents for construction permitting and book form <br /> specifications. Construction documents will comply with the requirements of <br /> Article 3.2.3 of the Part 2 Agreement between Indian River County and Barth <br /> Construction acting as Design/Builder. <br /> B. Purpose <br /> Construction Administration Services which will be considered Part 2 of our services. <br /> C. Compensation to the Architect <br /> Compensation for the Part 1 Services defined in Article"A"shall be a fixed fee of <br /> $84,645.00,including Reimbursable Expenses. <br /> D. Invoicing <br /> Invoicing shall be every two weeks. The Architect realizes his compensation is <br /> contingent upon Barth Construction being in receipt of payment from hudian River <br /> County in accordance with the Master Agreement and the Florida Prompt Payment Act, <br /> F.S.218.70,however,EDB Architects requests that the agreement between Barth <br /> Construction and IRC be front loaded to allow compensation for the Design Team work <br /> performed in Part 1. <br /> PROGRAMMING/SCOPE DATA $2,500.00 <br /> SCHEMATIC DESIGN PHASE $19,328.00 <br /> DESIGN DEVELOPMENT PHASE $24,160.00 <br /> WORKING DRAWINGS PHASE $38,657.00 <br /> REIMBURSABLE EXPENSES Included <br /> PART 1 TOTAL FEES S84,645.00 <br /> Page 2 of 3 <br /> 227 <br />