Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. Geosyntec <br /> 8 May 2015 consultants <br /> Page 3 <br /> Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and <br /> attend up to two meetings, with IRC SWDD, FDEP, and/or IRC Board of County Commission, <br /> as necessary. It has been assumed that one of these meetings will be in person and one meeting <br /> with be attended by conference call. Also, under this task, four hours has been included for the <br /> project manager to provide ongoing support to IRC SWDD related to interaction and negotiation <br /> with FDEP. <br /> Task 3—Annual Pollution Remediation Liabilities Evaluation: As requested by IRC SWDD, <br /> under this task, Geosyntec will prepare the annual environmental liability evaluation. This <br /> document is prepared annually in response to Governmental Accounting Standards Board <br /> Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution <br /> Remediation Obligations, which requires the inclusion and calculation of pollution remediation <br /> obligations. The objective of GASB No. 49 is to enhance the usefulness and comparability of <br /> pollution remediation obligation information reported by state and local governments. It has been <br /> assumed that the report will include evaluation of up to five sites, including, at a minimum, <br /> South Gifford Road Closed Landfill (4701 41' Street), Old Administration Building (1840 25th <br /> Street), and North County Reverse Osmosis Plant(7751 58t"Avenue). <br /> Task 4—Semi-Annual Sampling Activities: Under this task, Geosyntec will perform 2015 field <br /> activities related to the plume groundwater monitoring. The field activities will include field <br /> preparation, groundwater sampling, and water level measurements. Field preparation activities <br /> will include scheduling and staffing, subcontracting, coordination with the analytical laboratory, <br /> field equipment preparation, procurement of Passive Diffusion Bag (PDB) samplers and <br /> notifying FDEP and Vero Beach Municipal Airport of the field schedule. <br /> Geosyntec will perform the groundwater sampling activities associated with the CVOC plume <br /> monitoring wells. Sampling activities will be completed with a combination of PDB samplers <br /> and traditional low-flow sampling techniques. PDBs are anticipated to be purchased from EON <br /> Products, one of the few suppliers of this type of passive sampling device. This effort is <br /> anticipated to be completed by two people within one day during each of the semi-annual <br /> sampling events to save an additional mobilization (e.g. the PDBs to be sampled during the <br /> winter 2015 sampling event will be deployed during the summer 2015 event after sampling <br /> activities are completed). <br /> Groundwater sampling activities will be executed using a two-person sampling crew and will be <br /> performed in general accordance with the FDEP Standard Operating Procedures (SOPs). The <br /> proposed annual field event will be conducted in summer 2015 (tentatively in June) and will <br /> include sampling of 57 monitoring wells (46 wells using PDBs and 11 wells with traditional <br /> sampling techniques). The annual field event is budgeted to include four days for groundwater <br /> sampling activities and one day for PDB deployment for the next sampling event (total of five <br /> field days). The proposed semi-annual field event will be conducted in winter 2015 (tentatively <br /> XR15143\XR15021 <br /> engineers I scientists 1 innovators <br /> 243 <br />