My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br /> MAY 2015 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 4: Semi-Annual Sampling Activities <br /> ITEM BASISRATE QUANTITY ESTIMATED <br /> BUDGET <br /> A. Professional Services <br /> Senior Project Geologist hr $182 4 $728 <br /> Geologist hr $130 24 $3,120 <br /> Senior Staff Geologist hr $115 132 $15,180 <br /> Subtotal Professional Services $19,028 <br /> B. Technical/Administrative Services <br /> Field Superintendent hr $115 144 $16,560 <br /> Administrative Assistant hr $91 2 $182 <br /> Subtotal Technical/Administrative Service $16,742 <br /> C. Subcontractors <br /> Laboratory Analysis for VOCs each $73 87 $6,330 <br /> Laboratory Analysis for TOC each $27 3 $80 <br /> Laboratory Analysis for Dissolved Gases each $64 5 $321 <br /> Laboratory Analysis for Dhc each $305 2 $610 <br /> Laboratory Analysis for verA each $144 2 $289 <br /> Subtotal Subcontractor Services $7,630 <br /> D. Reimbursables <br /> PDBs quote $2,235 I $2,235 <br /> PDBs Reusable Supplies/Shipping LS $127 I $127 <br /> Drums each $50 2 $100 <br /> Drum Transport each $963 2 $1,926 <br /> Lodging day $101 18 $1,818 <br /> Per Diem day $51 18 $918 <br /> Communications Fee 3%labor 0.03 $35,770 $1,073 <br /> Field Vehicle day $97 20 $1,940 <br /> 8.5"x1I"Photocopies each $0.12 160 $19 <br /> Overnight Cooler each $95 2 $190 <br /> Groundwater Sampling Kit day $275 10 $2,750 <br /> Water Level Measurement Kit(2 person team) day $55 4 $220 <br /> PDB Deployment Kit day $100 2 $200 <br /> Equipment Shipping each $54 2 $108 <br /> Subtotal Reimbursables $13,624 <br /> TOTAL ESTIMATED BUDGET: PHASE 4 $57,025 <br /> Notes. <br /> 1. Lodging and per diem rates were taken from the GSA website for the Vero Beach area twww.gsa.govt. <br /> 2. Groundwater Sampling Kit includes two sets of the following:water level indicator,peristaltic pump,water quality meter(pH, <br /> temperature,conductivity,dissolved oxygen,and oxidation reduction potential),turbidity meter, tubing,and miscellaneous field supplie <br /> 3.Water Level Measurement Kit includes:water level indicator and miscellaneous field supplies. <br /> 4.PDB Deployment Kit includes:miscellaneous field supplies necessary to suspend and deploy PDBs. <br /> XR 15021 Geosyntec Consultants <br /> 251 <br />
The URL can be used to link to this page
Your browser does not support the video tag.