My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. 1 <br /> DATE OF ISSUANCE: 2/27/2015 EFFECTIVE DATE: 2/27/2015 <br /> OWNER: Indian River County <br /> CONTRACTOR: Mancil's Tractor Service, Inc. <br /> Bid No: 2014051 <br /> Project: Roseland Lake Clearing and Dredging <br /> OWNER's Contract No. 2014051 ENGINEER's Contract No. 1219 <br /> ENGINEER: Indian River County <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Construct an 18"Aluminized Corrugated Metal Pipe located at approximately at Station 2+25, right 80'. <br /> Purpose of Work Change Directive: <br /> The adjacent property owners'stormwater currently drains into an existing ditch and pipe not shown on <br /> the plans which drains into the western side of the Roseland Lake.The existing pipe is deteriorated <br /> beyond repair and is need of replacement <br /> Attachments: <br /> Plan Sheets 2&5, Revised 2/5/15 and 2/19/15 <br /> Mancil's Tractor Service, Inc. proposal dated 2/26/15 <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> NONE <br /> El Contractor's Records <br /> Q Lump Sum 0 Engineer's Records <br /> Q Other. <br /> By Work Change Directive: ❑By Change Order: <br /> Item 430-174-115- Pipe culvert(18")ACMP <br /> 40 LF x$95.00=$3,800.00 <br /> Estimated increase in Contract Price: <br /> $3,800.00 Substantial Completion: 100 days; <br /> Ready for Final Completion: 115 days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMEN ED: 'P"OV <br /> '��� <br /> ,11: By, /4" ) <br /> CONTRA OR(Sig :ture) ENGINEER(Signature) L-1:5 N/f ignatu - <br /> Date: 312)115— Date: 3- 12 — 15 Date: 3--/i /f <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS11219-Roseland Lake Improvements\Admim\Work Change Directives\1219-Work Change Directive til.doc <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.