Laserfiche WebLink
2. The AGENCY shall allow the DEPARTMENT and its contractors to enter onto the existing AGENCY <br /> property, including easements on property acquired by the DEPARTMENT, to construct this <br /> Project. No further permit or agreement shall be required to construct this project. <br /> 3. The AGENCY shall continue to maintain the existing shared use path and any property owned by <br /> AGENCY until the DEPARTMENT begins construction of the Project. <br /> 4. It is understood and agreed by the parties that upon "final acceptance" by the DEPARTMENT of <br /> the Project, (as that term is described in the Standard Specifications for Roadway and Bridge <br /> Construction dated 2015, as amended by contract documents), and Notice thereof to the <br /> AGENCY, the AGENCY shall be responsible for maintenance of said Project, at its own cost, in <br /> accordance with the following Federally and State accepted standards and all costs related <br /> thereto: (a) FDOT Plans Preparation Manual (PPM), current edition, (b) Florida Green Book <br /> dated 2011, as amended (c) Governing standards and specifications: FDOT Design Standards <br /> dated 2015, as amended (d)Standard Specifications for Roadway and Bridge Construction dated <br /> 2015, as amended by contract documents, and (e) Manual on Uniform Traffic Control Devices <br /> (MUTCD), current edition, or as amended. Maintenance of said Project includes, but is not <br /> limited to, infrastructure within the limits of the project. This provision, however, shall not <br /> preclude the AGENCY from entering into agreements with other entities for maintenance of <br /> infrastructure installed with the Project. Additionally, upon final acceptance the DEPARTMENT <br /> shall convey all acquired property interests to the AGENCY. The Department shall give the <br /> AGENCY ten (10)days notice before final acceptance. <br /> • The AGENCY grants herein to the DEPARTMENT all rights necessary to enter <br /> and construct the Project. <br /> 5. The AGENCY shall execute "Local Government Right of Way Certification Statement",attached <br /> as Exhibit B, indicating that the PROJECT can be completed within the public right of way, <br /> and/or that no additional right of way is required. <br /> 6. Warranties: The DEPARTMENT shall transfer any applicable warranties to the AGENCY. <br /> 7. Environmental permitting: If requested by the DEPARTMENT,the AGENCY shall sign as a joint <br /> applicant and be responsible for the permits related to the Project. Further the AGENCY shall be <br /> in compliance with all permits after the construction is complete and the right of way is <br /> transferred to the AGENCY. To the extent permitted by law,the AGENCY shall indemnify the <br /> DEPARTMENT for any violations by the AGENCY of any permits issued to the Department or <br /> jointly to the AGENCY and the DEPARTMENT after construction is complete.The AGENCY shall <br /> execute all documentation required by the permitting agencies in a timely manner to accept <br /> transfer of the Project. For various occupancy permits the AGENCY shall be the applicant. <br /> 8.Utilities: The AGENCY shall cooperate with the DEPARTMENT,to the extent necessary,to <br /> accomplish utility relocations for this Project.This shall include, but not be limited to,entering <br /> -2- <br /> 61 <br />