Consultant will update PLC code and tagging to bring existing SCADA system up <br /> to standards createdfor the upgrade, update HMI database tags and screen <br /> connections relative to this RIO panel, and update historical data collection and <br /> reporting relative to this RIO panel. <br /> SCHEDULE <br /> In general,the following schedule is anticipated and consultant will work as <br /> expeditiously as possible to meet it: <br /> Task 1 6 -8 weeks from Notice to Proceed (NTP) <br /> Task 2 4-8 weeks after Task 1 (partially started along with <br /> Task 1 <br /> Task 3 4-6 months after Task 2 (dependent on Panel <br /> Supplier) <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project,but <br /> may be required depending on circumstances that may arise during the execution <br /> of this project. Additional services include,but may not be limited to the following: <br /> • HMI programming of any water plant operations <br /> ITEMS FURNISHED BY OWNER <br /> The following items will be furnished by the Owner and are necessary for <br /> completion of the tasks described herein. <br /> • The purchase of.four. EN2T modules, any extra cabling and miscellaneous <br /> hardware to incorporate the modifications under Task 1 will be provided by <br /> IRCU. <br /> • Record panel drawings of existing chlorine room panel and clearwell (post- <br /> treatment)panel <br /> K:\WPB_Civit\044572031 IRCU SCADA Study\Scope\1RCU Water Plant SCADA Report•Modified.docx Page 4 <br /> 78 <br />