Laserfiche WebLink
SECTION 00520 - Agreement(Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The project consists of the construction of a 2650± LF by 12' wide asphalt <br /> millings walking trail. This walking trail loops through two properties in the Gifford <br /> Community located at the corner of 451" Street and 28th Court. One is the current site of <br /> the Historic Macedonia Baptist Church and the other property is the Gifford Health <br /> Center. Also included with project will be clearing and grubbing, grading and sodding. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Martin Luther King Walking Trail <br /> County Project Number: 1413 <br /> Bid Number: 2015034 <br /> Project Address: 2880 45th Street & 2625 28th Court Vero Beach, FL. <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> 00520-Agreement(Public Works)SAMPLE 81 <br /> 00520-2 <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail dmin\agenda items\00520-Agreement(Public Works)SAMPLE doc <br />