My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
06/02/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 2:16:38 PM
Creation date
8/12/2015 2:05:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/02/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The Annual.Average.Daily.Flow and the Maximum Daily Flows for calendar years : <br /> 2012, 2013,2014 and 2015 (thru Latest data available prior.to submitting). Required :, <br /> :for'Form 2A. <br /> :4: .A.summary.of the.annual effluent toxicity test results: ; <br /> 5. A Copy of the most recent Annual Wetlands System Treatment.Compliance and <br /> Performance Report: : <br /> 6; The most.recent Annual Reclaimed Water or Effluent Analysis:Report. <br /> 7. A map of the monitoring well locations with GPS coordinates.. <br /> 8. Copies of any orders or noticesissued by FDEF: <br /> 9.: :copies of.the Annual:Flow meter Certifications for:every flow meter. <br /> :10: Digital copies of binding agreements with major reclaimed water users <br /> Details of the required.information are attached in Attachment A : . • . : <br /> Task 3 O&M Performance Report <br /> :. : The O&M Performance report.requires an inspection of the facility:in.the:company of the : . <br /> chief operator and an evaluation of theperformance of the .treatment :plant. The <br /> :inspectionwill be:combined with the project kick off. meeting: . <br /> Data required include the following:_ : <br /> 1. A :Digital .Summary of 24 months: of flow and :all influent and effluent data. <br /> coverin period from Jul 2011.through Jul.y'30, 2012. (A digital summar of the. <br /> g they .1, . <br /> data). <br /> 2.: A Digital Summary of the' .Quarterly Groundwater.Monitoring Data (3rd and Orn. <br /> Quarter 2014, 1St and.27':Quarter 2015):for all:of the groundwater monitoring wells:. <br /> 3. The Operating Protocolfor the Facility <br /> ATKINS will develop the required :report and: submit a draft for review:prior to finale: <br /> :submittal. The: owner:.and the:chief operator: will be required to.sign the final document : <br /> prior tosubmission;to FDEP. : : <br /> : Task 4 Response to Request for Additional.Information <br /> Although every effort will be madeto submit a complete permitting package, :this is an <br /> NPDES permit and :requestfor additional information from .FDEP in response to EPA <br /> overview can be expected:: Should additional time and effort in exceSsi of this fee be <br /> regauired; Atkins will advise:IRC prior to proceeding::: <br /> Submittals: <br /> Atkins willprovide digital copies of each form or report for review and:comment prior to <br /> assembly: of the final permitting 'package. The :final. permitting package will .be. <br /> assembled in a single _bound document fora signature and submittal to FDEP: The. <br /> submittal package will include the following: <br /> 1.. Three copies for signature and submittal alongwith thepermit fee of $5,000 <br /> provided by IRC.. The check for the permit fee should be made out to the Florida. <br /> Department.of Environmental Regulation for renewal of IRC West WRF Plant Operating <br /> • Permit# FL0041637. <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.