My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
06/02/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 2:16:38 PM
Creation date
8/12/2015 2:05:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/02/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data/Information Requirements <br /> 1: A summary:of the annual effluent toxicity test results(Form 2a): <br /> 2. : Copy of the most recent Annual Wetlands System Treatment Compliance:. <br /> • and Performance Report (Form 2a)_ <br /> 3 The most recent Annual Reclaimed Water or:Effluent Analysis Report. . <br /> (Form 2a): <br /> 4: A Digital Summary.of 24months:of flowand_all influent and effluent data <br /> covering the period from f • July 1, 2013 through July 30, 2015..(a digital <br /> summary of.the data:-not the DM Rs pr spreadsheets as summary).(OMPR).. • <br /> 5. The Annual Average Daily Flowand the Maximum Daily Flows forcalendar <br /> years.2012,:201Z 2014and2015 (thru July 2009): (Form 2a) <br /> 6. : ._A Digital Summary of the Quarterly Groundwater Monitoring Data (3i and <br /> 4h Quarter 2 014,1st and 2PdQuarter 2015) for all of the groundwater <br /> t <br /> : : monitoring wells:(OMPR) . <br /> Also need a:map ofthe monitoring well locations with:GPS coordinates:(Form 2a) : <br /> 7:. Copies of any orders or notices issued by:FDEP. (Form 2a): : <br /> 8. : The current Operating Protocol and the dates of any updates provided to <br /> FDEP. (OMPR) <br /> 9.: .: Copies of the Annual Flow meter Certifications for every flow meter(Form .. <br /> 2a) : . <br /> FLW-1 Raw influent Flow Monitor/Totalizer/Recorder - <br /> FL,W-2 CCC Effluent.Flow Monitor/Totalizer/Recorder : <br /> FLW:3 South Plant Effluent to Wetlands Flow Monitor/Totalizer/Recorder <br /> FLW-4 West Plant Effluent to Wetlands:Flow Monitor/Totalizer/Recorder <br /> FLW-5. Wetlands Discharge Flow Monitor/Totalizer/Recorder.. <br /> : FLW-6 : West Plant Effluent to Reuse Flow Monftor/Totalizer/Recorder <br /> INF-1 , Raw Influent Sample Point <br /> • 30...'. :Complete.Industrial User.Section 5 of Form 2a one for each SIU- <br /> jsignificantindustrial user See attached)(Form 2a)': <br /> 11. Fill in the.blanks Section 3 Form 2a, Items 12, 13,,and 14(See Attached) <br /> The way this is supposed to work is that the wetlands effluent is sampled <br /> annually:in each of 3 years prior to the expiration date of the permit. If this :. <br /> has not been done need to start today and sample monthly for 3 . <br /> consecutive.months May,June, and july 2015. (Form 2a) <br /> 12.... :Annual Reuse Report(Form 2a) . : . <br /> 13: : Digital copiesof bindingagreements with:major,reclaimed water users— <br /> Update the table below(Form 2a) <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.