Laserfiche WebLink
EXHIBIT C <br /> CONSTRUCTION COST ESTIMATE <br /> INDIAN RIVER MEDICAL CENTER - HEALTH & WELLNESS CENTER <br /> OFF-SITE TURN LANES & FAIR SHARE SIGNALIZATION UPGRADES <br /> DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br /> IRMC 11th Drive Right Turn Lane on 37th Street <br /> Mobilization 1 LS $2,500.00 $2,500.00 <br /> Maintenance of traffic 1 LS $3,000.00 $3,000.00 <br /> Staked silt fence 400 LF $2.00 $800.00 <br /> Floating turbidity barrier 1 EA $300.00 $300.00 <br /> Wellpointing/dewatering 1 LS $3,000.00 $3,000.00 <br /> Strip ditch sides,clean out ditch bottom 1 LS $1,500.00 $1,500.00 <br /> Excavation(decel lane) 1 LS $3,000.00 $3,000.00 <br /> 12"Stabilized subgrade 836 SY $5.00 $4,180.00 <br /> 8"Crushed concrete base 738 SY $11.60 $8,560.80 <br /> 2"SP-12.5 asphalt&prime 733 SY $14.00 $10,262.00 <br /> Thermoplastic striping&signs 1 LS $1,800.00 $1,800.00 <br /> Survey/layout/as-builts 1 LS $3,500.00 $3,500.00 <br /> ,d,n�ti�tmIuIInn,ryb <br /> Total.M44k1k1 y 1gess Center Contribution $42,402.80 <br /> "0 NF f.‘ <br /> A ( 62015. *: <br /> l per Aol@F, P43 193 <br /> P.� <br /> Ma4<<11114%1410.1::-/ S <br /> pli%I4Ibi \ . <br /> 119 <br />