My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
06/02/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 2:16:38 PM
Creation date
8/12/2015 2:05:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/02/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data/Information Requirements <br /> 1. A summary of the annual effluent toxicity test results (Form 2a) <br /> 2. Copy of the most recent Annual Wetlands System Treatment Compliance <br /> and Performance Report (Form 2a) <br /> 3. The most recent Annual Reclaimed Water or Effluent Analysis Report <br /> (Form 2a) <br /> 4. A Digital Summary of 24 months of flow and all influent and effluent data <br /> covering the period from July 1, 2013 through July 30, 2015. (a digital <br /> summary of the data — not the DMRs or spreadsheets as summary) (OMPR) <br /> 5. The Annual Average Daily Flow and the Maximum Daily Flows for calendar <br /> years 2012, 2012, 2014and 2015 (thru July 2009). (Form 2a) <br /> 6. A Digital Summary of the Quarterly Groundwater Monitoring Data (3rd and <br /> 4th Quarter 2014, 1st and 2nd Quarter 2015) for all of the groundwater <br /> monitoring wells. (OMPR) <br /> Also need a map of the monitoring well locations with GPS coordinates. (Form 2a) <br /> 7. Copies of any orders or notices issued by FDEP. (Form 2a) <br /> 8. The current Operating Protocol and the dates of any updates provided to <br /> FDEP. (OMPR) <br /> 9. Copies of the Annual Flow meter Certifications for every flow meter(Form <br /> 2a) <br /> FLW-1 Raw Influent Flow Monitor/Totalizer/Recorder <br /> FLW-2 CCC Effluent Flow Monitor/Totalizer/Recorder <br /> FLW-3 South Plant Effluent to Wetlands Flow Monitor/Totalizer/Recorder <br /> FLW-4 West Plant Effluent to Wetlands Flow Monitor/Totalizer/Recorder <br /> FLW-5 Wetlands Discharge Flow Monitor/Totalizer/Recorder <br /> FLW-6 West Plant Effluent to Reuse Flow Monitor/Totalizer/Recorder <br /> INF-1 Raw Influent Sample Point <br /> 10. Complete Industrial User Section 5 of Form 2a one for each SIU — <br /> (significant industrial user See attached) (Form 2a) <br /> 11. Fill in the blanks Section 3 Form 2a, Items 12, 13, and 14(See Attached) <br /> The way this is supposed to work is that the wetlands effluent is sampled <br /> annually in each of 3 years prior to the expiration date of the permit. If this <br /> has not been done—need to start today and sample monthly for 3 <br /> consecutive months May, June, and july 2015. (Form 2a) <br /> 12. Annual Reuse Report(Form 2a) <br /> 13. Digital copies of binding agreements with major reclaimed water users— <br /> Update the table below (Form 2a) <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.