Keith McCuIIy <br />CHANGE ORDER NO. 6 - ITEM 6.10 <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Chris Selph <chrisselph@closeconstruction.us> <br />Friday, July 10, 2015 9:04 AM <br />Keith McCuIIy <br />Arjuna Weragoda; Mike Delaney; Terry Southard; Jerry Miller, 'Chris Rossi' <br />RE: PC SOUTH - RECORD DRAWING SUBMITTAL <br />I will get the surveyor back out to survey the concrete drive and sidewalk to satisfy the requirement. <br />Respectfully, <br />Chris Selph <br />Project Manager <br />Close Construction, LLC <br />(o) 863-467-0831 ext. 321 <br />(f) 863-763-6337 <br />From: Keith McCully [mailto:kmccully@ircgov.com] <br />Sent: Friday, July 10, 2015 8:47 AM <br />To: Chris Selph <br />Cc: Arjuna Weragoda; Mike Delaney; Terry Southard; Jerry Miller; Chris Rossi <br />Subject: RE: PC SOUTH - RECORD DRAWING SUBMITTAL <br />Chris, <br />We'II add the additional cost to the final change order. <br />Keith <br />Keith McCuIIy, P.E. <br />Stormwater Division <br />772-226-1562 <br />From: Chris Selph [mailto:chrisselph(acloseconstruction.us] <br />Sent: Wednesday, July 08, 2015 4:34 PM <br />To: Keith McCuIIy <br />Cc: Arjuna Weragoda; Mike Delaney; Terry Southard; Jerry Miller; Chris Rossi <br />Subject: RE: PC SOUTH - RECORD DRAWING SUBMITTAL <br />Keith, <br />The canal pump station was As -Built in October 2014. After the existing As -Built drawings were accepted, <br />Close was given Change Order #5. Our Change Order Proposal did not include any additional As-Builts of the <br />facility. Additional As-Builts will be approximately $450, how would you like to proceed? <br />1 <br />