My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/25/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
06/25/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 2:35:27 PM
Creation date
8/31/2015 12:24:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
06/25/2015
Meeting Body
Board of County Commissioners
Subject
Fire Station Locations
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 523-Credit kw Reserve Pumpers <br /> The second pumper item reviewed is Item 523 "Credit for Reserve Pumpers (CRP)". This <br /> item reviews the number and adequacy of the pumpers and their equipment with one (or <br /> more in larger communities) pumper out of service. The number of needed reserve pumpers <br /> is 1 for each 8 needed engine companies determined in Item 513, or any fraction thereof. <br /> The number of reserve pumpers credited in this item will not exceed the number of needed <br /> reserve pumpers. if only one reserve pumper is needed, and more than one reserve pumper <br /> is provided in the city, only the best equipped reserve pumper will be credited. Reserve <br /> pumpers are reviewed for pump capacity, hose carried, and equipment in the same manner <br /> as described in Item 512 except that Automatic Aid reserve pumpers are not considered. <br /> The value of the Reserve Pumper Credit (RPC) is determined by multiplying the credited <br /> Pump Capacity (PC) times the credit for the Hose Carried (HC) times the credit for the <br /> Equipment Carried(EC)times the factor for an overweight apparatus. <br /> After the items in 521 are factored to determine the points received for each reserve pumper, <br /> the reserve pumper with the largest points is selected for the Reserve Pumper Credit (RPC). <br /> The value for RPC is added to the value in Item 512 determined above. Next, the best <br /> equipped in-service pumper is subtracted from the in-service and reserve total. The <br /> difference is then divided by the total the possible points (654 or 554) times the Needed <br /> Engine Companies (NE). Finally, this quotient is multiplied by the 1 point available for the <br /> "Credit for Reserve Pumpers(CRP)". <br /> These points calculated for Indian River CO FD resulted in the following: <br /> CRP=0.51 points <br /> item 530-Credit for Pump Capacity <br /> The next item reviewed is Item 532 "Credit for Pumper Capacity (CPC)". The total pump <br /> capacity available should be sufficient for the Basic Fire Flow of 3500 gpm in Indian River CO <br /> FD. The maximum needed pump capacity credited is the Basic Fire Flow of the community. <br /> The pump capacity is obtained by test at the rated pump pressure. Credit is limited to 80 <br /> percent of rated capacity if no test data is available within two years of the survey date. Less <br /> than 80 percent may be credited if other mechanical features of the apparatus indicate a <br /> generally poor mechanical condition. <br /> The existing pump capacity (EP) represents the capacity of in-service pumpers, pumper- <br /> ladder,and pumper-service trucks that were credited in Item 513. <br /> The reserve pump capacity (RP)is that capacity of reserve pumpers, reserve pumper-ladder, <br /> and pumper-service trucks that were credited in Item 523. One-half the capacity of <br /> permanently-mounted pumps capable of delivering at least 50 gpm at 150 psi on other <br /> apparatus, reserve pumpers and reserve pumper-ladder and reserve pumper-service trucks <br /> not credited in Items 513 or 523 is credited in this item.This capacity is expressed as"OP". <br /> Automatic Aid pumper capacity is that capacity of pumpers credited as Automatic Aid in Item <br /> 513. The capacity credited does not exceed the percent determined by the value of the <br /> Automatic Aid plan determined in Item 512.D multiplies by the creditable pump capacity for <br /> each Automatic Aid pumper. This capacity is expressed as AAP. <br /> ®ISO Properties,Inc,2007 Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.