Laserfiche WebLink
The final step in determining the Credit for Fire Department is to add up the following eight <br /> components: <br /> Earned Credit <br /> Item Credit Available <br /> 513. Credit for Engine Companies(CEC) 5.23 10 <br /> 523. Credit for Reserve Pumpers(CRP) 0.51 1 <br /> 532. Credit for Pumper Capacity(CPC) 5.00 5 <br /> 549. Credit for Ladder Service (CLS) 2.71 5 <br /> 553. Credit for Reserve Ladder and Service Trucks(CRLS) 0.33 1 <br /> 561. Credit for Distribution (CD) 1.57 4 <br /> 571. Credit for Company Personnel(CCP) 7.07 15 <br /> 581. Credit for Training(CT) 5.94 9 <br /> Total Credit 28.36 50 <br /> If the score Indian River CO FD achieved for the fire department was translated into a 100- <br /> point scale instead of the 50-points actually used, the relative Fire Suppression Rating <br /> Schedule classification for this section of the review would be a (relative)Class 5. <br /> Water Supply <br /> Forty percent of a community's overall score is based on the adequacy of the water supply <br /> system. The ISO field representative evaluated: <br /> • representative building locations in the city to determine the theoretical amount of <br /> water necessary for fire suppression purposes(needed fire flow up to 3,500 gpm) <br /> • fire hydrants: size,type and installation to determine the capacity of the fire hydrants <br /> • hydrants: inspection and condition to review the fire hydrant inspection frequency, the <br /> completeness of the inspections and the condition of the hydrants <br /> item 616—Credit for Supply System <br /> The first item reviewed was Item 616 "Credit for Supply System (CSS)°. This item reviews <br /> the rate of flow that can be credited at each of the needed fire flow tests locations considering <br /> the supply works capacity, the main capacity and the hydrant distribution. The lowest flow <br /> rate of these items is credited for each representative location reviewed. A water system <br /> capable of delivering 250 gpm or more for a period of two hours plus consumption at the <br /> maximum daily rate at the fire location is considered minimum in the ISO review. <br /> To determine the score for Item 616 "Credit for Supply System", three sub items (Item 612 <br /> "Supply Works Capacity", Item 613 "Main Capacity" and Item 614 "Hydrant Distribution") <br /> need to be evaluated. <br /> L_LO <br /> ©ISO Properties.Inc.,2007 Page 29 <br /> b) <br />