Laserfiche WebLink
n <br /> M <br /> SECTION 2 <br /> Water Impact Fee Calculation <br /> This section describes the calculation of thero osed water impact fee.Th a <br /> p p p e capital <br /> investment in the water treatment facilities and water transmission and distribution system, <br /> including planned improvements to each system,is determined first.This capital invest- <br /> ment is then divided by the capacity of each system component to derive the unit invest- <br /> ment per mgd of capacity.Adjustments to this unit investment for future debt service <br /> principal payments and carrying costs are then made to derive the net unit investment <br /> per mgd of capacity.This net unit investment per mgd of capacity figure is then multiplied <br /> - by the capacity requirements of an ERU to derive the proposed impact fee per ERU.The <br /> changes in the water impact fee from current charges and a comparison of these charges <br /> with impact fees collected in other communities and counties is also presented. <br /> 2.1 Unit Capital Investment <br /> Unit capital investment calculations were performed separately for the water treatment <br /> facilities and the water transmission and distribution facilities.Capital investment calcula- <br /> tions for the water treatment facilities were limited to the most recent increments of capac- <br /> ity added to the water system at each treatment facility,as the County does not anticipate <br /> constructing additional treatment capacity during the study period(FY 1997 through FY <br /> 2001).The capital investment calculations for the water transmission and storage facilities <br /> included all current and planned capital improvements to the distribution components of <br /> the system through buildout(Year 2010). <br /> 2.1.1 Water Treatment Facilities <br /> The County's water treatment facilities consist of three facilities:the North Beach,North <br /> County,and South County water treatment plants(WTPs).Expansions of the North Beach <br /> and South County facilities have been constructed during the last 4 years.The North <br /> County WTP was constructed in 1995.Recent capacity additions at these facilities have cost <br /> in excess of$24 million and provide 13.66 mgd of treatment capacity.The weighted average <br /> unit cost of these facilities per mgd of capacity is estimated at$1,771,000.Exhibit 2-1 <br /> summarizes these calculations. <br /> 2.1.2 Water Transmission Facilities <br /> The County's investment in water transmission and storage facilities in 1993 was estimated <br /> at more than$25 million.An additional$10 million of improvements to the water transmis- <br /> sion and storage facilities have been made since that time,and an estimated$73 million of <br /> improvements are planned to be constructed prior to system buildout in 2010.At buildout, <br /> i the water system is expected to have a capacity of 39.14 mgd.The unit investment per mgd <br /> of buildout capacity is estimated to range from$2.0 to$2.3 million per mgd during the <br /> 5-year study period.Exhibit 2-2 shows these calculations. <br /> OFIW12073.DOC 2-1 <br />