The additional phases identified in the study are as follows: <br /> Phase 2—Modeling to determine available volume of water in SRID canal system; potentially <br /> a pilot study; <br /> Phase 3 — Negotiations with the various drainage districts to secure withdrawal permits and <br /> pump station/transmission piping ROW; pre-application meetings with regulatory agencies; <br /> Phase 4—Negotiations with property owners;final site selection; preparation of purchase <br /> agreements; ROW agreements for pipelines; <br /> Phase 5—Detailed design of the reservoir or ASR well system, piping and treatment;final <br /> permitting; and <br /> Phase 6—Construction <br /> CDM prepared a draft proposal for the Phase 2 identified above. The proposal identified the following <br /> subtask for the study as: <br /> Task 1—Data Collection,Compilation and Evaluation <br /> Task 2—Field Reconnaissance/Resource Assessment <br /> Task 3—Hydrologic/Hydraulic (H/H) Evaluations <br /> Task 4—Summary Report <br /> Task 5—Stakeholder Coordination <br /> Alternate Task—Water Quality Analysis <br /> The alternate task identified as Water Quality Analysis indicated on Exhibit A(Surface Water Reservoir <br /> Analysis Phase 2) was obtained in an effort to conduct water quality studies in the SRID canals when <br /> authorized personnel were onsite conducting the H/H evaluation under Task 3 concurrently. The <br /> rationale was to minimize duplicative time and effort. The cost for the alternate task is approximated <br /> at $100,000.00. However, after further review staff and the consultant decided that the alternate <br /> task may be premature if the H/H evaluation results indicated a lack of supply within the SRID basin <br /> for withdrawal. Therefore, this task was excluded from the Phase 2 budget but merely noted in the <br /> subject agenda to notify the board of the level of analysis that would be required at some future date <br /> when a viable area for the alternative water supply reservoir is determined. Completion of Phase 2 is <br /> to be 365-days from notice to-proceed. The cost of the Phase 2 modeling study is$197,490.00. <br /> Page 2 of 4 <br /> F:\Utilities\UTILITY-Engineering\WATER\Alternative Water Supply\2014 Alternative Water Supply\Admin\Agenda-Alternative Water Supply 110 <br /> Evaluation-6-11-15.docx <br />