My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The CONSULTANT will compile, review and analyze the following data for its use as it relates to <br /> stormwater model development described under Task 3. <br /> a. Topographic data(1-foot contour)for the study area. <br /> b. Indian River County future land use data. <br /> c. Hourly rainfall and annual evaporation records for up to three gages available from the <br /> National Climatic Data Center(NCDC). <br /> d. Available hourly stream flow and stage records for the United States Geologic Survey <br /> (USGS)gage on the Sebastian River. <br /> e. Existing minimum flows and levels(MFLs)determined by St.Johns River Water <br /> Management District(SJRWMD)for the Sebastian River. <br /> f. Available existing hydrologic or hydraulic(H/H)models(e.g., ICPR, HSPF)for areas <br /> covering, adjacent to,or downstream of the SRID. <br /> g. Indian River County Flood Insurance Study(FIS)and digital flood insurance rate maps <br /> (DFIRMs). <br /> Subtask 1.2—Field Monitoring <br /> The CONSULTANT will collect physical data for each canal (L,C, D and Bypass),as well as at the <br /> downstream location(just south of County Road 512 bridge)where all 3 canals merge.The <br /> CONSULTANT will subcontract with Carter and Associates,Inc.(CAI)who will perform the field <br /> monitoring and collection of survey data to define the geometry for each of the lateral canals(one <br /> cross-section at each of the four canals). CAI will also collect continuous stage data at each of the three <br /> outfall structures controlling flow from the lateral canals.Additionally,velocity and elevation data for <br /> Lateral D will also be measured as this is an un-controlled channel.These data will be collected over a <br /> time period of approximately 4 to 6 months(to capture dry and wet season periods).CAI will also collect <br /> rainfall data from a local rain gauge for the same time period.The CONSULTANT will perform <br /> coordination with CAI throughout the monitoring duration. The CONSULTANT will review stage, <br /> velocity,flow and rainfall data collected by CAI to confirm that it meets the thresholds of the monitoring <br /> equipment and that it does not contain anomalies that may affect its validity for subsequent use in <br /> surface water modeling(Task 3). The CONSULTANT will use the measurements(velocities,stages) <br /> collected under Subtask 1.1 to calculate flow at each of the control structures and Lateral D. <br /> Subtask 1.3-Data Evaluation and Summary <br /> To further support the modeling effort described in Task 3,the CONSULTANT will summarize the <br /> available data provided by the OWNER,obtained from regulatory agencies,or collected in Task 1.1.The <br /> CONSULTANT will evaluate the above data and summarize potential data gaps,recommendation for <br /> data gap resolution,and the data that will be incorporated.The CONSULTANT will prepare a summary of <br /> results in a draft Report Section with supporting graphics and tables which will be provided to the <br /> OWNER for review.Any additional data collection needs will be negotiated under separate cover and <br /> are not included in this Scope of Services or corresponding budget estimate. <br /> TASK 2-FIELD RECONNAISSANCE/RESOURCE ASSESSMENT <br /> The CONSULTANT will supply two personnel to complete a limited one-day field review of the canal <br /> system(specifically in the vicinity of the cross sections/data collection locations)to observe existing <br /> conditions.The CONSULTANT will rely on existing information (Task 1)to the extent possible, but may <br /> use additional observations made at the site to supplement information already documented.The <br /> CONSULTANT will take photographs and document the results of the field review in a draft Report <br /> Section.The OWNER will assist the CONSULTANT, if needed,with obtaining access to the site from SRID <br /> in order to conduct the field review.The CONSULTANT will also set up a teleconference with SJRWMD to <br /> With A-2 pisec_Exewn n.ao« <br /> 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.