Laserfiche WebLink
7/24/2015 <br /> Project Phases - Revised <br /> Phase 1 — This evaluation (comments discussed today) <br /> Phase 2 — Modeling; potential pilot study (draft scope today) <br /> Phase 3 — Negotiations with drainage district(s); preliminary <br /> permitting (local and state) <br /> Phase 4 — Negotiations with property owners; land acquisition <br /> Phase 5 — Final permitting and design <br /> Phase 6 — Construction <br /> Smith <br /> Key Assumptions <br /> Proposed surface water treatment plant to be co-located with <br /> North County WTP (no siting for new WTP included) <br /> Route piping along CR510 and 77th Avenue to take advantage of <br /> existing ROW <br /> Adequate water available in SRID to supply system (Phase 2 <br /> modeling needed to confirm) <br /> Smith <br /> ' -A- 2 <br />