Laserfiche WebLink
7/24/2015 <br /> CUP Modification and UFA Modeling Scope <br /> Prepare and submit CUP modification application requesting <br /> operational flexibility to operate north county WTP at full capacity <br /> and south county WTP as needed. <br /> Complete groundwater modeling of the UFA to determine extents <br /> of impacts from operating north county wellfield at design capacity. <br /> Continue to monitor offsite impacts of pumping in north county. <br /> This option is recommended in parallell with continued <br /> investigation of alternative water supply, as encouraged by <br /> SJRWMD. <br /> Smith <br /> Phase 2 Scope Highlights <br /> Data compilation and review <br /> Collect necessary flow, discharge, usage, groundwater table and stage <br /> data; as-built details and build out land use conditions <br /> Compile topographic, future land use, rainfall, stream flow/stage <br /> (Sebastian River), MFLs, available hydrologic or hydraulic models and <br /> IRC FIS and FIRM maps <br /> Field Monitoring to collect physical data for each canal and the <br /> confluence (survey data, continuous stage data, velocity and elevation <br /> on Lateral D, and rain gauge data) for 4 to 6 months (wet and dry <br /> season) <br /> Smith <br /> .A-18 <br />