Laserfiche WebLink
other than claims in stated amounts as may be specifically excepted by the <br /> CONTRACTOR for all things done or furnished in connection with the work <br /> under this Contract and for every act and neglect of the OWNER and others <br /> relating to or arising out of the work. Any payment, however, final or otherwise, <br /> shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Public Construction Bond. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and',others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions-to the Construction Contract. <br /> ARTICLE 8 -CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: -, . <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Biddihg'Docu' `•ents. <br /> B. CONTRACTOR has visited the Site andbecome familiar witlaaand is satisfied as to the <br /> general, local, and Site conditio . at may+ affect, ost, progress; and performance of the <br /> Work. �:7::,- 0 <br /> C. CONTRACTOR is familiar with an,.71, e--":-Ted as I federal, state, and local Laws and <br /> Regulations that ma cost, pry a ,-ss,"' performance of the Work. <br /> D. CONTRACTOR has •� ful'� ,di .--, .all: O reports of explorations and tests of <br /> subsurface conditions at • ontigu a sr A the Site and all drawings of physical conditions <br /> in or relating to a (sting sitifilo surfaceor ,sii•- face structures at or contiguous to the Site <br /> (except Un g `« .r Faciliti .;which -have been identified in the Supplementary <br /> �rw� <br /> Conditions as ovi• -a t4.aragra 4.02 of the General Conditions and (2) reports and <br /> rd s of a lard <br /> ��d�y' `" g � r.nm ntal Condition, if any, at the Site which have been <br /> identified in the STippyrerienta ,,,-onditions as provided in paragraph 4.06 of the General <br /> conditions. <br /> E. Ca' T TORhas wined and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations, investigations, explorations, tests, <br /> studies, and data onceming conditions (surface, subsurface, and Underground Facilities) <br /> at or contiguous`p the Site which may affect cost, progress, or performance of the Work <br /> or which relateto any aspect of the means, methods, techniques, sequences, and <br /> procedures of construction to be employed by CONTRACTOR, including applying the <br /> specific means, methods, techniques, sequences, and procedures of construction, if any, <br /> expressly required by the Contract Documents to be employed by CONTRACTOR, and <br /> safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> 00520-Agreement(Public Works)SAMPLE <br /> 00520-5 28 <br /> F.1Public WorkstENGINEERING DIVISION PROJECTSN506-Gifford Neighborhood 45th St BeautficationWdmin\agenda items\00520-Agreement(Public Works) <br /> SAMPLE.doc <br />