The Contractor is responsible for obtaining a County Public Works Engineering Division right-of- <br /> way permit. The Contractor shall also submit a Traffic Control Plan to the County Public Works <br /> Traffic Engineering Division a minimum of 72 hours prior to construction and notify County Traffic <br /> Engineering a minimum of 24 hours before any lane closures. A temporary access plan shall be <br /> provided indicating how local traffic will be maintained while the existing road is removed and <br /> reconstructed. Stand mounted Advance Construction signing shall be installed in accordance with <br /> FDOT Index 602. One lane closures shall be in accordance with FDOT Index 603. When any <br /> work encroaches the area between the centerline and two (2)feet outside the edge of pavement, <br /> traffic shall be restricted to a single lane. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be generally described <br /> as follows: <br /> Project Name: 8" Water Main Extension on Indian River Drive South of Roseland <br /> Road <br /> Bid Number: 2015029 <br /> Project Address: Indian River Dr. south of Roseland Rd. <br /> ARTICLE 3—TERM AND CONTRACT TIMES <br /> 3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 10 calendar days from effective date of Notice to Proceed, Contractor shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job. <br /> 3. Perform all photographic recording and documentation of conditions prior <br /> to construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Mobilize all labor, equipment, and materials. <br /> 6. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> (b) From 16 calendar days to 90 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br /> Substantial Completion. <br /> (c) From 91 calendar days to 120 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> Section 00530-2 <br /> 37 <br />