Laserfiche WebLink
INDIAN RIVER FLORIDA ��� <br /> COUNTY, �� �� <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E, Public Works Director <br /> THROUGH: Christopher j. Ka6erJr, P.E, County Engine <br /> FROM: Richard B.Szpyrka, P.E, Project Engineer <br /> SUBJECT: AWARD OF BID <br /> 87t Street and 911Avenue Sidewalk Improvements <br /> IRC Project No. 12OS, Bid No. 2015036 <br /> DATE: July 1,3D15 <br /> DESCRIPTION AND CONDITIONS <br /> On March 11, 2015, the Board of County Commissioners entered into a Local Agency Program (LAP) <br /> Agreement FM #431728'1-50/60-01 with the Florida Department of Transportation (FDCT) for the <br /> construction of 6-foot wide concrete sidewalks along the north right of way line of 87th Street from 101" <br /> Avenue toCR51Oand along the east right ofway line ofg1"Avenue from 791h �Street tp0Jn Street,including <br /> drainage improvements, svxaUegrading, pavement markings and sodding mfdisturbed areas\nVero Lake <br /> Estates. Also included in the grant amount are Construction, Engineering and Inspection (CEI)services. <br /> The bid opening for the project was held on May 20, 2015. Seven (7) bids were received and opened. A <br /> detailed bid tabulation ismnfile and available for viewing inthe County Engineering Division. Bid totals are <br /> as follows: <br /> Blue Goose Construction, LLC Ft. Pierce, Florida $1,013,267.71 <br /> Kerns Construction&Property Mgrmt. Inc. Ft. Pierce, Florida $1,004,854.00 <br /> Timothy Rose Contracting, Inc. Vero Beach, Florida $1,325,094.51 <br /> Douglas N. Higgins, Inc. Ann Arbor, Michigan $1°341,389'98 <br /> Sunshine Land Design, Inc. Stuart, Florida $1,465,010.41 * <br /> Johnson-Davis, Inc. Lantana, Florida $1,490,406.00 <br /> EngeconConstruction, Inc. Lake Worth, Florida $1,565,310.15 * <br /> *Denotes mathematical errors were found and bid amounts corrected. <br /> Blue Goose Construction, LLC., failed to submit a complete bid package by omitting the required Equal <br /> Opportunity Office form. In addition, per the Contract Documents, Instructions to Bidders Article 3, <br /> Qualification of Bidders: Article 3.01 A requires bidders to have °a1 least five years" experience in <br /> construction of similar projects of this size and larger.Article 3.01 B requires bidders to have"successfully <br /> constructed, as prime CONTRACTOR, at least three projects similar in scope to this projec1.°The projects <br /> listed by Blue Goose Construction,I.I.C.,include utility type improvements with no mention of sidewalk work <br /> thus it does not appear that they have successfully constructed at least three similar project as the prime <br /> CONTRACTOR. Therefore the next lowest bidder Kerns Construction & PropertyK4gnot. Inc. has been <br /> selected this project.TheFDCTTconcursvvbhthisoe|ec±imn. <br /> r �� <br /> �vx <br /> v^ 'wom `: <br /> � �o/wnmw�.mny'`�pxox'''n��/zo�'�rv,/^�,|.°um � * <br /> � y �'x� xL/o/,'xumcx�/v'|�ap^^um"xu:unu" <br />