Laserfiche WebLink
relating to or arising out of the work. Any payment, however, final or otherwise, <br /> shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Public Construction Bond. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE 8 -CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents. <br /> B. CONTRACTOR has visited the Site and:become familiar with and is-satisfied as to the <br /> general, local, and Site conditions that=<may affect;cost; ogress, and performance of the <br /> Work. "x <br /> C. CONTRACTOR is familiar wit aii d is sates. _, a �o all federal ite, and local Laws and <br /> Regulations that may affect cost`ap�fess, arae " 'rformance of the Work. <br /> Cti . +�'1 <br /> D. CONTRACTOR has carefully s .t fed' "I: (1) orts of explorations and tests of <br /> >: .a <br /> subsurface conditio <or contigu to e;,Site andgall drawings of physical conditions <br /> in or relating to ex s ce or=�N kbsurfWe <br /> ' tructures at or contiguous to the Site <br /> (except Undergrounc whi : haen identified in the Supplementary <br /> Conditions;as provided ink {agra4 wof the General Conditions and (2) reports and <br /> '64-m-,Y:.ia Y 3P. .. . .4. <br /> drawings o.# ardous v�conmeitaiihondition, if any, at the Site which have been <br /> 6t '$ Gn.�. . <br /> identified in Igmentary< onditions as provided in paragraph 4.06 of the General <br /> Conditions. <br /> E. bNTRACTOR Ise alned Za)d carefully studied (or assumes responsibility for having <br /> . <br /> done so) all additlgrl`or supplementary examinations, investigations, explorations, tests, <br /> to t,olCerning conditions (surface, subsurface, and Underground Facilities) <br /> at orr uousto t suite which may affect cost, progress, or performance of the Work <br /> or which relate Uc any aspect of the means, methods, techniques, sequences, and <br /> procedures of co struction to be employed by CONTRACTOR, including applying the <br /> specific mean' hods, techniques, sequences, and procedures of construction, if any, <br /> expressly req'iired by the Contract Documents to be employed by CONTRACTOR, and <br /> safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents. <br /> H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site, reports and drawings identified in the <br /> 00520-5 00520-Agreement(Public Works)Sample 97 <br /> F:1Pub4ic WorksIENGINEERING DIVISION PROJECTS\1317-85th St Milling_91 st Ave to 101st AWAftinlagenda demst00520-Agreement(Public Works)Sample.doc <br />