My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2015
CBCC
>
Meetings
>
2010's
>
2015
>
07/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 11:36:59 AM
Creation date
9/8/2015 11:36:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
above) which pertain to the subsurface or physical conditions at or contiguous to the site <br /> or otherwise may affect the cost, progress, performance or furnishing of the work as <br /> CONTRACTOR considers necessary for the performance of furnishing of the work at the <br /> Contract Price, within the Contract Time and in accordance with the other terms and <br /> conditions of the Contract Documents, including specifically the provisions of Paragraph <br /> 4.02 of the General Conditions; and no additional examinations, investigations, <br /> explorations, tests, reports, studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br /> the Contract Documents with respect to existing underground facilities at or contiguous to <br /> the site and assumes responsibility for the accurate location of said underground facilities. <br /> No additional examinations, investigations, explorations, tests, reports, studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.04 of the General <br /> Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the <br /> Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br /> discrepancies that he has discovered in the Contract Documents and the written resolution <br /> thereof by ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8 CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR conceming the work consist of the following: <br /> 8.1 This Agreement (Section 00530). <br /> 8.2 AIA Document A310 Bid Bond (Section 00410). <br /> 8.3 Schedule of Subcontractors (Section 00431). <br /> 8.4 Disclosure of Relationships (Section 00452). <br /> 8.5 Sworn Statement under the Florida Trench Safety Act (Section 00454). <br /> 8.6 General Information Required for Bidders (Section 00456) <br /> 8.7 Public Construction Bonds (Section 00610). <br /> 8.8 Notice of Award and Notice to Proceed (examples in Section 00800). <br /> 8.9 General Conditions (Section 00700). <br /> 8.10 Supplementary Conditions (Section 00800). <br /> 8.11 Specifications bearing the title "Blue Cypress New Replacement Package WWTF" as listed <br /> in the table of contents hereof. <br /> 108 <br /> 00530-5 ATTACHMENT NO.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.