My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2015
CBCC
>
Meetings
>
2010's
>
2015
>
07/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 11:36:59 AM
Creation date
9/8/2015 11:36:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENTAGENDA <br /> INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Direc <br /> Christopher J. Kafer,Jr., P.E., County Engine <br /> FROM: Richard B.Szpyrka, P.E., Project Engineer <br /> SUBJECT: Indian River County Intergenerational Recreation Facility(IG Bldg) <br /> at South County Regional Park—Change Order No. 2 <br /> IRC Project No. 1135 <br /> DATE: July 1, 2015 <br /> DESCRIPTION AND CONDITIONS <br /> On December 9,2014 the Board of County Commissioners approved awarding Bid No.2014052 to KAST <br /> Construction Company,LLC,(KAST)for the IG Bldg project in the amount of$10,676,278.03.At the time, <br /> it was anticipated that the building permit for the project would be issued within 90 days. A <br /> preconstruction meeting was held on January 13,2015 and a tentative notice-to-proceed date of March <br /> 2, 2015 was established. <br /> The IG Bldg design plans were originally reviewed by the Indian River County Building Department on <br /> October 1,2014 with comments returned to Borrelli&Partners,Inc.,the design consultant.Following a <br /> series of design submittal-and-review cycles,as well as a 'change' in the IG Bldg structural calculations <br /> which necessitated thicker tilt-walls and larger footers,a building permit was finally issued on May 27, <br /> 2015. <br /> On June 23, 2015 the Board of County Commissioners approved Change Order No. 1 in the amount of <br /> $145,832.13,for the increase in cost of thicker tilt-walls and larger footers due to the structural design <br /> changes to the IG Bldg. Approval of Change Order No. 1 allowed KAST to start construction of the <br /> foundation footers,floor slabs,and tilt walls. <br /> KAST has finalized and submitted to the County additional costs associated with changes to the IG Bldg <br /> structural calculations and delay claim costs incurred as a result of delays associated with the building <br /> permit issuance.Discussions regarding the delay claim costs from KAST are ongoing. However,to keep <br /> the project moving forward,staff is requesting additional funds in the amount of$46,968.43 to fund the <br /> additional costs associated with structural changes to the plans for the roof joists and the embedment <br /> steel for the tilt walls manufactured by S&S Welding/CANAM Buildings.Approval of Change Order No.2 <br /> will allow for the roof joist and embedment steel procurement process,which is part of the critical path <br /> for the project,to continue uninterrupted while construction of the footers,floor slab,and tilt walls is <br /> underway. <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1135-S County Park Intergeneratiional Rec Facility\Admim\agenda items\Change Order <br /> #2\1135-IG Building-Change Order#2 Revision for Joist Steel only.doc 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.