My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2015
CBCC
>
Meetings
>
2010's
>
2015
>
07/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 11:36:59 AM
Creation date
9/8/2015 11:36:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> KAST Construction Company, LLC <br /> 701 Northpoint Parkway,Suite 400 <br /> West Palm Beach, FL 33407 <br /> June 30,2015 <br /> Dan Trbovich,Project Architect via e-mail: dtrbovich@borrelliarchitects.com <br /> Borrelli+Partners <br /> 720 Vassar Street <br /> Orlando, FL 32804 <br /> Christopher Kafer, P.E.County Engineer,via e-mail: via e-mail: ckafer@ircgov.com <br /> Indian River County Engineering Division <br /> 180127th Street Vero Beach,FL 32960 <br /> Richard B.Szpyrka,P.E. via e-mail: rszpvrka@ircpov.com <br /> Indian River County Engineering Division <br /> 180127"'Street Vero Beach,FL 32960 <br /> Re: Indian River County Intergenerational Recreation Facility <br /> 1590 9th Street SW,Vero Beach, FL <br /> Subj.: Delayed Construction/Extended Conditions Costs/Conformed Drawings Added Work <br /> Dan/Chris/Rich, <br /> In accordance with the contract documents, articles GC 12.03, SC 11.01. Al and 10.05, (Claims) we <br /> have monitored and tracked the costs KAST has incurred as a direct result of the extended time related <br /> to the delayed issuance of conformed drawings and a building permit. The Conformed documents <br /> were received by KAST on 05/22/2015 at 1:30 PM. The Permitted Set was received by us on <br /> Wednesday the 27th of May 2015. KAST immediately issued the Conformed, (revised)drawings to the <br /> affected subcontractors and vendors for pricing. Most subcontractor and vendor price increases were <br /> received by 06/12/2015 but some price increases were dependent on RFPs and could not be collected <br /> until 6/29/2015 <br /> The project delay commenced on April 16th, 2015 and has continued up to and including June 30, <br /> 2015. 76 days have elapsed since the delay began on 04/16/2015. The following represents the <br /> extended general conditions,(up to and including the 30th of June 2015)and the added costs for the <br /> additional work of the conformed drawings. The work of the conformed drawings has also added <br /> 15 days to the concrete tilt wall durations.Those 15 work days impacted the project schedule by 14 <br /> calendar days, (2 weeks). <br /> 1 <br /> 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.