My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2015
CBCC
>
Meetings
>
2010's
>
2015
>
07/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 11:36:59 AM
Creation date
9/8/2015 11:36:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140 S.Ellis Road <br /> JACKSONVILLE <br /> 4�� CANAM FL,UNITED STATES,32254 <br /> Tel.(904)781-0898 <br /> Fax(904)71111-4090 <br /> Emall:Petew.Lee@cananVmWmwm <br /> Change order <br /> Date 06/0512015 Change Order No 001-5 <br /> Company S&S WELDING INC. Issued by Peter Lee <br /> Attention Richard Grandy Project INDIAN RIVER REC CTR GYM <br /> Fax (863)533-2885 Project Code R01448 <br /> Email richard0s7swelding.corn <br /> The sales contract mentioned above is revised as follows: <br /> Description of revisions Additions Deductions <br /> Rev 3 dated 5-20-15 <br /> S1.00-02 All wind load values were revised <br /> S1.03.02 <br /> -15 joist Increased in size from 30K8 to 30K11 <br /> -3 joist increased In size from 301(8 to 30KCS5 <br /> -1 joist decreased In size from 30KCS6 to 30K11 <br /> -2 Joist added 301(1 1 <br /> -Key note 1,for 5K load and I*max deflection added to 6 Joist. <br /> Quality deflection of I"based live load of 20 psf. <br /> S1.03.03 =16� 6:wgl 4_e2,14 <br /> -Key plan note I applied to 9 joist 72DLH 16,fora� OK Int <br /> load and I*max live load deflection.Qualify deflection of IN <br /> based live load of 12 psf. <br /> -Added 4 fan loads <br /> -Deck between grids L&M was changed from a I 1/2"B deck to $2,170.00 <br /> a 3"deep N deck,52 sqs. <br /> -Added weight for areas 1 &2 Is 10 tons $18,000.00 <br /> -Added weight for the Gym is tons. 2.006�q /<9 <br /> C.Oio_o-9 <br /> A /120 <br /> -Add OD loads of freight $8'aso.09 <br /> Ad detailing and engineering cost to make the changes $4,300.00 1 <br /> SUBTOTAL 36,090.00 <br /> TAX 2,215.40 <br /> TOTAL $38,305.40 <br /> 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.