Laserfiche WebLink
ADDENDUM #1 <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H Placing Sod. The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with appropriate <br />tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered <br />so as to avoid a continuous seam along the line of flow. Along the edges of such <br />staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to <br />prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod <br />shall be tamped so as to produce a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br />finished sod elevation is 11R below paved shoulder <br />On slopes greater than 3.1, the Contractor shall prevent the sod from sliding by means <br />of wooden pegs driven through the sod blocks into firm earth, at suitable intervals <br />Sodding shall not be performed when weather and soil conditions are, in the <br />Engineer's opinion, unsuitable for proper results. <br />Sod shall be placed around all structures, equipment pads, etc <br />I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br />as determined by the Engineer, for optimum results. After being placed, the sod shall <br />be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />J Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the establishment <br />of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K Article 570-9. The first two paragraphs under this Article are deleted and the <br />following is added: <br />The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary <br />Item of Payment <br />Payment shall be made under: <br />Bid Item No 570-1-2 — Performance Turf (Sod) (Bahia) - Per Square Yard <br />01025-51 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St_101st Ave to CR510 <br />(LAP)1Admim \ADDENDUMS \ADDENDUM 1 \Technical Specifications Addendum #1 doc <br />