Laserfiche WebLink
ADDENDUM #1 <br />SECTION — 104 - PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND <br />WATER POLLUTION <br />PART 1 — GENERAL <br />1 1 SCOPE <br />A. This Section covers erosion control and the treatment of dewatering water and stormwater <br />runoff from the construction site and work area. The pollution control measures shall <br />prevent turbid or otherwise polluted waters from being discharged from the construction <br />site or work area, to undeveloped portions of the site or off-site. <br />B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br />construction site or work area to be a very serious offense The CONTRACTOR is <br />solely responsible for preventing pollution caused by dewatering water and stormwater <br />runoff from the construction site or work area. <br />C. The pollution control measures specified herein represent minimum standards to be <br />adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br />reserves the right to require the CONTRACTOR to employ additional pollution control <br />measures, when in the sole opinion of the OWNER, they are warranted If site specific <br />conditions require additional erosion and stormwater pollution control measures during any <br />phase of construction or operation to prevent erosion or to control sediment or other <br />pollution, beyond those specified in the Drawings or herein, implement additional best <br />management practices as necessary, in accordance with Chapter 4, "Best Management <br />Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment <br />Control Inspector's Manual, and other references as may be required by regulatory <br />permits (http //www dep state.11 us /waterinonpoint/docsierosionierosion-inspectors- <br />manual.pdf) <br />D The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br />Section, Alternatively, the OWNER may halt the CONTRACTOR's operations until the <br />CONTRACTOR is in full compliance with this Section. If the OWNER halts the <br />CONTRACTOR's work as a result of its failure to comply with this Section, the Construction <br />Contract time clock will continue to run. <br />E. In addition to these Specifications, comply with Chapter 4 - "Best Management Practices <br />for Erosion and Sedimentation Control" and Chapter 5 — "Best Management Practices for <br />Dewatering" of the Florida Erosion and Sediment Control Inspector's Manual. In the event <br />of a conflict between the referenced Chapters and these Specifications, the more stringent <br />requirement shall prevail <br />1 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br />A The OWNER has obtained certain permits for this project and they are listed in <br />paragraph SC -6 08 of the Supplementary Conditions Per paragraph SC -6 08.A.2 of <br />the Supplementary Conditions, the CONTRACTOR shall apply for, obtain, and pay for <br />01025-12 Technical Specifications <br />F \Public Works \ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St_101st Ave to CR510 <br />(LAP)\Admim \ADDENDUMS \ADDENDUM 1 \Technical Specifications Addendum #1 doc <br />