Laserfiche WebLink
ADDENDUM #1 <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed If a water quality <br />violation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340 <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br />Maintenance Installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State Certified erosion control subcontractor who <br />specializes in the installation and maintenance of such devices. After installation, this <br />specialty subcontractor shall maintain the erosion and stormwater pollution control <br />devices until in the ENGINEER's sole opinion, the devices are no longer necessary <br />(such time not to extend past the date the OWNER formally accepts the project as <br />complete). Before beginning construction, submit to Indian River County for review <br />and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the <br />certified erosion control subcontractor. Construction shall not begin until the SWPPP <br />has been approved by Indian River County Submit the approved SWPPP to the <br />ENGINEER before beginning construction. Include in the SWPPP, the "Contractor's <br />Affidavit Regarding Erosion Control and Treatment of Dewatering Water and <br />Stormwater From the Construction Site" (located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, 1 6.C, <br />and 1.6.D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />alteration of the chemical, physical, biological, or radiological integrity of off-site water <br />in quantities or at levels which are or may be potentially harmful or injurious to human <br />health or welfare, animal or plant life, or property Pollutants to be removed include but <br />are not limited to, sediment and suspended solids, solid and sanitary wastes, <br />01025-14 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St_101 st Ave to CR510 <br />(LAP)1Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />