Laserfiche WebLink
ADDENDUM #1 <br />G. Construction Site Egress Driveways: Minimize the transport of sediment and soil from <br />the construction site or work area by vehicle wheels. Construct a crushed rock driving <br />surface at the vehicle exit point(s). Provide an area large enough to remove the <br />sediment and soil from vehicle wheels before the vehicle leaves the construction site <br />or work area. Provide wash -down stations as required to wash vehicle tires and retain <br />all washwater on-site Do not use limerock. <br />H Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Crushed limerock shall not be used under any <br />circumstance <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), <br />washed and meeting the requirements of FDOT Standard Specifications for <br />Road and Bridge Construction, Section 901. <br />Hay Bales: Hay bales shall not be used <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to minimize <br />erosion and capture and remove pollutants from the construction site and from all <br />other areas disturbed by construction activities. <br />B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br />Item of Pa ment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Erosion & Water Pollution Control - Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-18 Technical Specifications <br />F \Public Works \ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St_101st Ave to CR510 <br />(L.AP)\Admim \ADDENDUMSlADDENDUM 1 \Technical Specifications Addendum #1 doc <br />