My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-159
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:36:18 PM
Creation date
9/11/2015 10:55:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2015
Control Number
2015-159
Agenda Item Number
8.X.
Entity Name
Kerns Construction & Property Management Corp.
Subject
Sidewalk Improvements
Contract Documents & specifications
Area
87th Street and 91st Avenue
Project Number
1205
Bid Number
2015036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #1 <br />SECTION - 110 - CLEARING AND GRUBBING <br />The work specified in this item shall conform to Section 110 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. (2015) with the <br />following modifications: <br />A. Prior to any clearing and grubbing, the contractor will stake the right-of-way. <br />Unimproved areas shall be cleared of trees, logs, stumps, brush, vegetation, rubbish <br />and other perishable or objectionable matter within limits shown on the plans <br />excepting for certain trees and shrubs shown on the plans or as directed by the <br />Engineer which are to remain undisturbed and protected. Stumps and roots between <br />slope stakes in cuts and in embankments 3 feet or less in depth shall be removed to a <br />depth of 18 inches below subgrade. No stumps, roots, or perishable matter of any <br />description shall remain under concrete slabs or footing, including pavement and <br />sidewalks. <br />B. No trees shall be removed or relocated until the Engineer or his representative has <br />marked all trees to be saved, after a review of the project site with the Contractor's <br />representative. <br />C. Where the final pavement or structural work will be close to existing trees, the <br />Contractor shall exercise care in the vicinity of the trees. Further, the Contractor shall <br />saw cut along the edge of the outside limits of the stabilization, structure subgrade or <br />sidewalk to a minimum depth of 4 feet below the finish grade and paint with a <br />commercial grade pruning paint the ends of all sawn roots If directed by the Engineer <br />or where shown on the drawings, work shall be done by hand in order to protect the <br />trees. <br />D. The Contractor shall exercise care whel 11 working in n the vicinity pity of all trees to r e� i laii <br />so as to not damage or remove major root structures. The Contractor shall not pull <br />hair or major root structures. AH severed roots shall be sawn clean and paint with <br />pruning paint. Stumps, roots, etc., shall be completely removed and disposed of by <br />the Contractor. Undesirable, dead, and/or damaged trees (as so designated by the <br />Engineer) shall be removed. <br />E. All trees to be removed shall be disposed off site, burning will be strictly prohibited. <br />F. All trees or shrubs which are to remain shall be preserved and protected by the <br />Contractor. Where the removal of valuable trees or shrubs specifically for <br />transplanting is required, this work shall be done in cooperation with the Owner and at <br />no additional expense to the Owner. <br />G. All items to be removed shall be excavated to their full depth All culverts removed <br />from residential driveway entrances within the right-of-way shall become the property <br />of the respective homeowner Those homeowners not desiring the culverts may <br />donate them to the County free of charge (See Paragraph C, Special Provisions) <br />The Contractor shall transport the culverts to the County's storage yard. All metal <br />castings for catch basins, manholes, or other structures shall be carefully removed <br />01025-22 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St_101st Ave to CR510 <br />(LAP)\Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.