My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-159
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:36:18 PM
Creation date
9/11/2015 10:55:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2015
Control Number
2015-159
Agenda Item Number
8.X.
Entity Name
Kerns Construction & Property Management Corp.
Subject
Sidewalk Improvements
Contract Documents & specifications
Area
87th Street and 91st Avenue
Project Number
1205
Bid Number
2015036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #1 <br />120-1.2.3 Earthwork Category 3: Includes the earthwork and related <br />operations associated with the construction of new mainline pavement, along with concrete <br />box culverts, retaining walls, and other drainage structures on the mainline pavement. <br />120-2 Classes of Excavation. <br />120-2.1 Excavation of Unsuitable Material: Excavation of unsuitable material <br />consists of the removal of muck, clay, rock or any other material that is unsuitable in its <br />original position and that is excavated below the finished grading template. For stabilized <br />bases and sand bituminous road mixes, the finished grading template is the top of the <br />finished base, shoulders and slopes. For all other bases and rigid pavement, the finished <br />grading template is the finished shoulder and slope lines and bottom of completed base or <br />rigid pavement. <br />120-2.2 Lateral Ditch Excavation: Lateral Ditch Excavation consists of all excavation <br />of inlet and outlet ditches to structures and roadway, changes in channels of streams, and <br />ditches parallel to the roadway right-of-way. Dress lateral ditches to the grade and cross- <br />section shown in the plans. <br />120-2.3 Channel Excavation: Channel Excavation consists of the excavation and <br />satisfactory disposal of all materials from the limits of the channel as shown in the plans <br />120-2.4 Excavation for Structures and Pipe: Excavation for Structures consists of <br />the excavation for bridge foundations, box culverts, pipe culverts, storm sewers and all other <br />pipe lines, retaining walls, headwalls for pipe culverts and drains, catch basins, drop inlets, <br />manholes, and similar structures. <br />120-3 Excavation Requirements. <br />120-3.1 Excavation and Replacement of Unsuitable Materials. Where rock, muck, <br />clay, or other material within the limits of the roadway is unsuitable in its original position, <br />excavate such material to the cross-sections shown in the plans or indicated by the Engineer, <br />and backfill with suitable material. Shape backfill materials to the required cross-sections. <br />Where the removal of plastic soils below the finished earthwork grade is required, meet a <br />construction tolerance of ± 0.2 foot in depth and ± 6 inches (each side) in width. <br />120-3.2 Lateral Ditch Excavation: Excavate inlet and outlet ditches to structures and <br />roadway, changes in channels of streams and ditches parallel to the roadway. Dress lateral <br />ditches to the grade and cross-section shown in the plans. <br />120-3.3 Channel Excavation: Excavate and dispose of all materials from the limits of <br />the channel as shown in the plans. Excavate for bridge foundations, box culverts, pipe <br />culverts, storm sewers and all other pipe lines, retaining walls, headwalls for pipe culverts and <br />drains, catch basins, drop inlets, manholes, and similar structures <br />120-3.4 Excavation for Structures and Pipe. <br />120-3.4.1 Requirements for all Excavation: Excavate foundation pits to permit <br />the placing of the full widths and lengths of footings shown in the plans, with full horizontal <br />beds. Do not round or undercut corners or edges of footings Perform all excavation to <br />foundation materials, satisfactory to the Engineer, regardless of the elevation shown on the <br />plans. Perform all excavation in stream beds to a depth at least 4 feet below the permanent <br />bed of the stream, unless a firm footing can be established on solid rock before such depth is <br />reached, and excavate to such additional depth as may be necessary to eliminate any danger <br />of undermining. Wherever rock bottom is secured, excavate in such manner as to allow the <br />solid rock to be exposed and prepared in horizontal beds for receiving the masonry. Remove <br />01025-24 Technical Specifications <br />F-Tublic Works\ENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St101st Ave to CR510 <br />(LAP)\Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.