My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-159
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:36:18 PM
Creation date
9/11/2015 10:55:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2015
Control Number
2015-159
Agenda Item Number
8.X.
Entity Name
Kerns Construction & Property Management Corp.
Subject
Sidewalk Improvements
Contract Documents & specifications
Area
87th Street and 91st Avenue
Project Number
1205
Bid Number
2015036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #1 <br />334-5.3 Mix Temperature: Heat and combine the ingredients of the mix in such a manner <br />as to produce a mixture with a temperature at the plant and at the roadway, within a range of +30°F <br />from the target temperature as shown on the mix design. Reject all loads outside of this range. <br />334-5.4 Transportation of the Mixture: Transport the mixture in vehicles previously <br />cleaned of all foreign material. After cleaning, thinly coat the inside surface of the truck bodies with <br />soapy water or an asphalt release agent as needed to prevent the mixture from adhering to the beds <br />Do not allow excess liquid to pond in the truck body. Do not use diesel fuel or any other hazardous <br />or environmentally detrimental material as a coating for the inside surface of the truck body. Cover <br />each load at all times. <br />334-5.5 Preparation of Surfaces Prior to Paving: <br />334-5.5.1 Cleaning: Clean the surface of all loose and deleterious material by the <br />use of power brooms or blowers, supplemented by hand brooming where necessary. <br />334-5.5.2 Patching and Leveling Courses: Where the HMA is to be placed on an <br />existing pavement which is irregular, wherever the plans indicate, or if directed by the Engineer, <br />bring the existing surface to proper grade and cross-section by the application of patching or <br />leveling courses. <br />334-5.5.3 Application over Surface Treatment: Where an asphalt mix is to be <br />placed over a surface treatment, sweep and dispose of all loose material from the paving area. <br />334-5.5.4 Tack Coat: Apply a tack coat on existing pavement structures that are to <br />be overlaid with an asphalt mix and between successive layers of all asphalt mixes, unless directed <br />otherwise by the Engineer. Use a tack coat product meeting FDOT specifications. Use an emulsified <br />tack coat spread rate of 0.02 to 0.08 gal/sy or as specified by the Engineer. <br />334-5.6 Paving: <br />334-5.6.1 Alignment of Edges: With the exception of pavements placed adjacent to <br />curb and gutter or other true edges, place all pavements by the stringline method to obtain an <br />accurate, uniform alignment of the pavement edge. Control the unsupported pavement edge to <br />ensure that it will not deviate more than ± 1.5 inches from the stringline. <br />334-5.6.2 Rain and Surface Conditions: Immediately cease transportation of <br />asphalt mixtures from the plant when rain begins at the roadway. Do not place asphalt mixtures <br />while rain is falling, or when there is water on the surface to be covered. Once the rain has stopped <br />and water has been removed from the tacked surface to the satisfaction of the Engineer and the <br />temperature of the mixture caught in transit still meets the requirements as specified in 334-5.3, the <br />Contractor may then place the mixture caught in transit. <br />334-5.6.3 Checking Depth of Layer: Check the depth of each layer at frequent <br />intervals, and make adjustments when the thickness exceeds the allowable tolerance of 1/4". <br />Address any material outside of this tolerance per the direction or the Engineer. When making an <br />adjustment, allow the paving machine to travel a minimum distance of 32 feet to stabilize before the <br />second check is made to determine the effects of the adjustment. <br />334-5.6.4 Hand Spreading: In limited areas where the use of the spreader is <br />impossible or impracticable, spread and finish the mixture by hand. <br />334-5.6.5 Spreading and Finishing: Upon arrival, dump the mixture in the <br />approved paver, and immediately spread and strike -off the mixture to the full width required, and to <br />such loose depth for each course that, when the work is completed, the required weight of mixture <br />per square yard, or the specified thickness, is secured. Carry a uniform amount of mixture ahead of <br />the screed at all times. <br />334-5.6.6 Thickness of Layers: Construct each course of Type SP mixtures in layers <br />of the thickness shown in 334-1.5.1. <br />01025-39 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St101st Ave to CR510 <br />(LAP)\AdmirMADDENDUMS\ADDENDUM 1 \Technical Specifications Addendum #1 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.