My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-174
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:41:50 PM
Creation date
9/21/2015 1:33:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/15/2015
Control Number
2015-174
Agenda Item Number
8.X.
Entity Name
Southeastern Surveying & Mapping Corporation
Subject
Renewal of Annual Surveying Mapping Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Subsurface Utility Engineering Services <br />Designating Services <br />Project Manager <br />Senior Technician <br />2 man crew <br />3 man crew <br />Vacuum Excavation <br />Test Holes <br />1 Test Hole/Dirt <br />1 Test Hole/Asphalt/Concrete <br />2 - 19 Test Holes/Dirt <br />2 - 19 Test Holes/Asphalt/Concrete <br />20 - 49 Test Holes/dirt <br />20 - 49 Test Holes/asphalt/concrete <br />50 - 99 Test Holes/dirt <br />50 - 99 Test Holes/asphalt/concrete <br />100 or more Test Holes/dirt <br />100 or more Test Holes/asphalt/concrete <br />GPR Bore Route <br />Vacuum Excavation for Environmental Services <br />Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand <br />10 feet prior to drilling. (3"-4" in diameter, 8' to 10' deep, concrete/asphalt removed if necessary) <br />1 - 9 Monitoring Wells/Soil Samples <br />10 - 19 Monitoring Wells/Soil Samples <br />20 - 49 Monitoring Wells/Soil Samples <br />Utility Clearing - Using Ground Penetrating Radar <br />as well as Conventional Electronic Line Locators <br />$118.00 / per hour <br />$88 00 / per hour <br />$191.00 / per hour <br />$2221.00 / per hour <br />$422.00 <br />$525.00 <br />$361.00 / each <br />$412.00 / each <br />$330.00 / each <br />$371.00 / each <br />$283.00 / each <br />$330.00 / each <br />$252.00 / each <br />$288 00 / each <br />$515.00 / each <br />digging down 8 feet to <br />An hourly rate of $294.00 will be used for all exploratory excavation projects. <br />Larger excavation projects which require specialized equipment (shoring, de -watering, etc.) will b <br />task basis. <br />Utility Coordination Services <br />Senior Utility Coordinator <br />Utility Coordinator <br />CAD Technician <br />Survey Services for Utility Projects <br />Project Manager/Professional Surveyor and Mapper <br />Two Person Survey Field Team <br />Three Person Survey Field Team <br />Clerical <br />Concrete Radar Mapping/Imaging <br />(concrete assessment/inspection, grid scans, density & debris assessment) <br />1 Man Crew <br />Closed Circuit Televising (CCTV) Services <br />Maintenance of Traffic (MOT) <br />If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of <br />same <br />SSMC MOT Lane Closures Per Lane Closure <br />$258.00 / each <br />$206.00 / each <br />$155.00 / each <br />$118.00 / per hour <br />e quoted on a task by <br />$118.00 / per hour <br />$88.00 / per hour <br />$77.00 / per hour <br />$118.00 / per hour <br />$118.00 / per hour <br />$149 00 / per hour <br />$52.00 / per hour <br />$118.00 / per hour <br />$118.00 / per hour <br />Gary B Krick, PSM / President <br />Per Lane Closure <br />May 19, 2015 <br />Date <br />$361.00 / per day <br />$515.00 / per night <br />
The URL can be used to link to this page
Your browser does not support the video tag.