Laserfiche WebLink
3. The County has inspected the fence that was taken down priorto beginning of the <br />jectforao|idnassandfoundithobeinonoatisfoctorycondibunandunab|ebzbere- <br />installed. The County or its contractor will replace and install 311 linear feet of three <br />board wooden fence at the County's expense along the east side of the Kurpi|'n <br />property on the Kurpirs property. <br />4. The County will place two dump truck loads of fill on the north side of the pond. This <br />dirt will be placed at a point to be established by the Kurpils with a stake to mark the <br />point. The Kurpils shall be responsible to grade the dirt. The graded area wilI be <br />sodded by the County. <br />5. The County or its contractor has graded and sodded a swale along the south property <br />line of the County stormwater property. The swale will be constructed so that water <br />will drain from east to west to the swale located along the western edge of the Lateral <br />A subdivision property. The existing swale on the north western portion of the KurpiI <br />property will be fi||ed(nandsmddedbytheCouUtyoritsoontroctor. <br />6. In the event that the drainage pipe along 67th Avenue (west side of the Kurpfl property) <br />is too small and/or the existing drainage swale along the west side of the Kurpil <br />property needs to be re -graded, the pipe shall be upsized and/or the swale regraded <br />These tasks shall be performed by the County or its contractor at the County's <br />expense. <br />7. The County or its contractor will install an outfall pipe from the Kurpil pond to the swale <br />along the south edge of the County stormwater property. The disturbed area will be <br />sodded following installation of the pipe. This work shall be done at the County's <br />expense. <br />8. The County or its contractor will move dirt from the southeast area of the pond and <br />restore the bank and cover the bare soil with sod <br />2 <br />