My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-188
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 8:23:37 AM
Creation date
9/24/2015 1:40:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/22/2015
Control Number
2015-188
Agenda Item Number
12.G.1.
Entity Name
CDM Smith Inc.
Subject
Consumptive Use Permit Modification
Upper Floridan Aquifer Modeling
UFA Groundwater Modeling
Area
North County Water Plant
Project Number
CCNA-2014 WO. No.3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project and schedule for the permit modification. Consultant's Project Manager and modelers (2) will <br />participate in the pre -application conference. <br />Subtask 1.2 Preparation of Modeling Approach Memorandum <br />In advance of the pre -application conference, Consultant will prepare a memorandum summarizing the <br />proposed modeling approach to be used in support of the CUP modification. The memorandum will <br />specifically identify the model(s) to be used, verification of the SEC model calibration, the groundwater <br />withdrawal scenarios to be included and the report format to be submitted to SJRWMD. This document <br />will be used at the pre -application conference to obtain input and consensus from the permit reviewers <br />prior to commencing modeling activities. <br />Subtask 1.3 Preparation of Permit Application <br />Consultant will prepare and submit SJRWMD Form No. 40C-2 900(1)(e), Consumptive Use Permit for <br />Public Supply — Form E. The application, per the Applicant's Handbook, will be required to include the <br />following: <br />• Historical water use; <br />• Wellfield operating schedule; <br />• Groundwater model summary report; and <br />• Application fee. <br />Preliminary discussions with SJRWMD permitting staff indicate that there will not be a requirement to <br />update the water conservation plan, reuse feasibility study, population projections or unaccounted for <br />water survey. If SJRWMD determines, upon submittal of the initial application, that these updates are <br />required, additional services will be negotiated with the County prior to commencing additional work. <br />Consultant will submit an electronic draft of the application to the County for review and comment prior <br />to the submittal to SJRWMD. To the extent possible, consultant will submit the application and <br />supporting documentation electronically through the SJRWMD e -Permitting system. Consultant will <br />furnish the County with an electronic file of all documents submitted to SJRWMD in support of the <br />application. The County will furnish the check for the permit application fee, to be submitted to <br />SJRWMD by the Consultant. An application package will be submitted to SJRWMD within 120 days of <br />receipt of the Notice to Proceed for this Work Order. <br />Subtask 1.4 Response to Requests for Additional Information <br />Consultant will respond to up to two requests for additional information (RAI) from SJRWMD, provided <br />that neither request includes revisions to the modeling efforts. If additional modeling is required, an <br />amendment to this Work Order will be negotiated prior to commencing work. This task assumes a level <br />of effort to reply to each of the two RAIs of 16 hours (total 32 hours). If response to the RAI(s) requires a <br />more detailed response than anticipated, Consultant will notify the County and negotiate the additional <br />services prior to incurring additional costs. <br />CDM <br />Smith <br />A-2 <br />jj1703_1tr with Exhibits.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.