Laserfiche WebLink
• <br /> 110TH STREET ESTIMATED PROJECT COST FOR WATER <br /> INDIAN RIVER COUNTY PROJECT NO. UW-97-XX-DS <br /> ESTIMATED CONSTRUCTION COST <br /> 6"PVC W M 870 L F 9 7,830 <br /> FHA I UNIT 1700 1,700 <br /> WET TAP I L S 1500 1,500 <br /> SERVICES SHORT 9 UNIT 300 2,700 <br /> SERVICES LONG 9 UNIT 450 4,050 <br /> SODDING 870 L F 2.5 2,175 <br /> 2"B. 0. 1 UNIT 200 200 <br /> JUMPER 1 UNIT 800 800 <br /> 15%CONTINGENCY 3,145 <br /> AS-BUILT 1,000 <br /> PERMIT 500 <br /> MOBILIZATION&VIDEO 3,500 <br /> ENGINEERING&SURVEY 5,000 <br /> ADMINISTRATIVE EXPENSES 2-600 <br /> TOTAL ESTIMATED PROJECT COST $36,700 ' <br /> ESTIMATED SQUARE FOOTAGE TO BE ASSESSED 361,983 <br /> ESTIMATED COST PER SQ FT ( ROUNDED) $0.101386 <br /> J D C R 0 W <br /> AUG 13, 97 <br /> 110TH202.WK4 <br />