My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-195
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 8:25:20 AM
Creation date
10/12/2015 12:10:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/06/2015
Control Number
2015-195
Agenda Item Number
8.Q.
Entity Name
Wantman Group Inc.
Subject
South Relief Canal Railing Repair
Work Order No. 1
Area
43rd Aveunue Bridge over IRFWCD
Project Number
1523
Alternate Name
Bridge Design Associates
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oar <br />September 11, 2015 <br />Indian River County <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Attention: Richard B. Szpyrka, P.E. <br />Project: 43`d Avenue Bridge over South Relief Canal Bridge Railing Repair <br />Indian River County No. 1523 <br />Dear Rich: <br />Pursuant to the County's request, Wantman Group Inc. (WGI) can provide the necessary <br />engineering services for the proposed repairs to the damaged railing. <br />Based on our discussions with staff, we will review modifying the current post and beam traffic <br />railing by utilizing a retrofit guardrail system as shown in FDOT Index 470's or by modifying to a <br />crash tested barrier system. <br />In order to provide the necessary design and detailing we will obtain field measurements of the <br />existing bridge and obtain a site topographical survey of the bridge site and canal banks on all four <br />corners of the bridge within the existing roadway rights-of-way. <br />Our team will also submit to Indian River Farms Water Control District for a permit to modify the <br />current guardrails inside their right-of-way. <br />Our services will include plans and specifications and details necessary to bid the project. <br />Indian River County will provide the necessary survey. <br />Our design will be based on current FDOT and Indian River County Standards. <br />We will provide 5 signed and sealed sets of completed plans as well as an electronic version for <br />your use. <br />The attached Exhibit "A" is an approximate hourly breakdown by task for our services based on our <br />approved hourly rates under our Continual Contract Agreement. <br />Permit fees are not included in our proposal. <br />WGI proposed to complete the work 60 days following notice to proceed. <br />If you have any questions, please give me a call. <br />Respe Ily, <br />B ' an C. Rheault, P.E., #38797 <br />S:\2015-Jobs\_Proposals\43rd over S Relief Canal railing\01 Admin\Proposals\proposal 09-11-15.docx <br />1402 Royal Palm Beach Blvd , Bldg 200, Royal Palm Beach. FL 33411 t: 561 686 3660 1: 561.791 1995 www wantmangroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.